1999-025 Bid Award for NPBCC Clubhouse Renovation• RESOLUTION 25-99
A RESOLUTION OF THE VILLAGE COUNCIL OF NORTH PALM BEACH, FLORIDA,
ACCEPTING THE BID OF MARK SCHWARTZ CONSTRUCTION MANAGEMENT, WEST
PALM BEACH, FLORIDA, 1N THE AMOUNT OF $535,000 FOR RENOVATION AND
ADDITION TO THE NORTH PALM BEACH COUNTRY CLUB CLUBHOUSE, AND
ALTERNATE BID NO. 1, IN THE AMOUNT OF $2,250 FOR EXTERIOR PAINTING;
FUNDS TO BE EXPENDED FROM L8059-66210 (CONSTRUCTION & MAJOR
RENOVATION).
BE IT RESOLVED BY THE VILLAGE COUNCIL OF NORTH PALM BEACH, FLORIDA:
Section 1. The bid of Mark Schwartz Construction Management, West Palm Beach,
Florida, in the amount of $535,000 for renovation and addition to the North Palm Beach Country
Club Clubhouse, and Alternate Bid No. 1, in the amount of $2,250 for exterior painting, a copy
of which is attached to this Resolution, is hereby accepted by the Village of North Palm Beach,
Florida, in accordance with its terms. The appropriate Village officials are hereby directed to
advise said bidder of this acceptance. The monies are to be expended from L8059-66210
(Construction & Major Renovation).
Section 2. This Resolution shall take effect immediately upon passage.
PASSED AND ADOPTED THIS 13th DAY OF MAY , 1999.
ATTEST:
• Village Clerk ~~
^ ~,1~
yor
G~H E. A S1 i R I C A `! I .`! S T I T U T E q y .1 R t: fl i i E C T
~t~
t:i'.I
u
A/A Docun:ent A101
Standard Form of Agreement Between
- Owner and Contractor
where the basis of payment is a
STIPULATED SUM
1987 EDITION
THIS DOCUMENT HAS IMPORTAA'T LEGAL CONSEQUENCES; CONSULTATION WITH
AN ATTORNEY IS ENCOURAGED W/TH RESPECT TO /TS COMPLETION OR .t~IODIFICAT/O.N.
The 1987 Edition ojA/A Document A301, Genera! Conditions ojtbe Gbntract jor ConstrucNOn, fs adopted
!n tbfs document by reference. Do not use u'ftb other genera! condittons unless lhts document !s modiJted.
This document hu been approved and endorsed by The Associared General Contraceors of Amcrin.
AGREEMENT
made as of the day of in the year of
Nineteen Hundred and
BETWEEN the Owner: VILLAGE OF NORTH PALM BEAC~1
(A~me and nddreu) 5 0 1 U. S. 1
NORTH PALM BEACH, FL 33408
and the Contractor: MARK SCHWARTZ CONSTRUCTION MANAGEMENT INC.
(.'rune nnA ndrtress) 11011 FOREST HILL BLVD., SUITE '206
• WEST PALM BEACH, FL 33414
The Project is: RENOVATIONS AND ADDITIONS TO
(,~itnte and locnrron) NORTH PALM BEACH COUNTRY CLUB CLUBHOUSE
The Architect is: STEPHEN BORUFF, AIA
(,Vnnre turd nr/dreu) ARCHITECTS AND PLANNERS, INC.
701 NORTH POINT PARKWAY
WEST PALM BEACH, FL 33407
The Owner and Contractor agree as sec forth below,
• - Cop)•right 1915. 1918, 1925, 1917, 1951, 1953. 1961. 1963. 19G7, 19%a, 1977, ®198' by The Amuriean Institute u(.Archi•
tecu, 1735 Kew York Avenue, N.W., Washington, D.C. 20rR16. Rcproductiun of the material hcrdn or substantial yuoutiun
of its provisions without wrlaen permission u(the AIA violates the copyright laws of thr L'nlad Stites and sill be suhjra to
legal proxcution.
AIA DOCUMENT Af01 • OWNER~CONTRACTOR AGREE?fE~T • Tw"ELFTII f.DIT10N • AIAe • ~A I~R17
T11E A>IERICA~I.~sTITI.~TE OF ARCIIITECTS, I7SS NEW YORK A~'E~l.'!.\W., 4'ASIIINGTON.nC. ltaatG A101.1987 t
WARNING: Unllpnaed pholtsoopylnq vloNlaf U.S. oopyrlghf laws and b au0jeel to lagai proucuflon.
ARTICLE 1
THE CONTRACT DOCUMENTS
• The Contntt't Ducuma)ts consist of d)is .tbrcentent.Condition:e of the ContractlCencr:J. Suppirn)rntaf)'and other Cr)ndnion;l,
Drap'1ny5, SpClltll atl0115, alldClld'J i55Ued pfnif (O CSeClltlUtl O( till> .AgfCCI11Cn1. Od)l'f dUi JnTenIS IIS[Ctl Itl [1115 AgICCRlenl .lad
Modrticatiune owed after execution o(this .>green)ene these form the Contract, and arc as fully a par[ of the Cuntract:u if atuched
«) this Agreement or repealed herein. The Contract rcprusent, d)e entire and integrated agreen)ent bea~'eaf the panics hereto
and supcrsedcs prior negaiazions, representations or agreements, either w~rinen or oa1..An cnumeatiaf of the Contra Drxumenrs.
other than Modifications, appears in .article 9.
ARTICLE 2
THE WORK OF THIS CONTRACT
The Contncor shall execute the entire vG'ork described in the Contact Documents, except ro the extent specifically indicated in
the Contract Documents to be the responsibility of others, or u follon•s:
N/A
ARTICLE 3
DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
3.1 The date of commencement b the date from which the Contact Time of Patagnph 3•? is measured, and shall be the date of
this Agreement. u firs[ written above, unless a different date is sa[ed below or provision is made for the date to be fixed in a notice
to proceed issued by the Owner.
(/ntrrt the dale u/ ronmlrurrnmYl, r/ 11 dl//rrt/wm Ilx date nJ rbrt Agrernrrnt ur, 1/app/lrnb(r, rtner tbnt t6r dale Y~!!/ br/Ixrd !n n nurire to prua+d./
COMMENCEMENT DATE WILL BE FIXED IN A NOTICE TO PROCEED.
Unless the date of commencement is established by a no[itt to proceed issued by the Owner, the Contactor shall notify [he
Owner in a•dting not less than five daps before commencing the Work to permit the timely tiling of mongagu, mechanic's liens
and other security Interests.
3.2 The Contractor shall achieve Substantial Completion of [he entire Work not later [han
(brsrrt Ibr « drndm dote urnumber u/rnlrndur des?s n/err tbrdnte u Cumnrr+rrrmnrL dlru brtrn nnP m/rrlrrmenlt/ur earl/rr Subtrnutrul lurnpleriun r/rrn
(4111 parNrllfr b/for tr•41}• // Irat r(aled rllrY'brre Yr lar CYrlbart ~Ymmrtr.J
120 CALENDAR AFTER DATE OF COMMENCEMENT.
,subject to adjustments of this Contact Time u provided in the Contact Documents.
(lrrrt'rr pan'%tl4rrf. 1/rlrrl'. I0I l/r/IddYlyd rf(Inra/tIT IflrrtDlJt th /rt!(ure to rnnr(dvtr nn tier<•.)
• AND SUBJECT TO LIQUIDATED DAMAGES AS PROVIDED IN THE CONTRACT
DOCUMENTS.
AIA DOCUMENT A101 • ONI'NENCONTRACTOa AGREEMENT • TWELFI'fl EDITION • AIAa • ~'IrA17 rt
TI tE A?IENICAx LxSTITI'TE OF Aa(:1IITECTS, I'SS xEa• )'Oax Ae ENCE, N.W.. WAi111NGT(ri. D C. aaax. Al ~1 1987
WARNING: Unlicanaad photxopylnq vlolataa V.S. eopyrlght Iswf end la au0lect to legal prolacutlon.
1r 11
u
ARTICLE 4
CONTRACT SUM
4.1 The Owner shall pay [he Contncror in current funds for the Con[ractor's performance of [hc Contract the Convact Sum of
Dollars
!s5 3 7 , 2 5 0 . 0 0 ), subject to additions and deductions ss prot ided in the Con-
tact Documents.
4.2 The Contract Sum Lt based upon the following alterna[es, if any, which are described in the Contract Documents and are
hereby accepted by the Owner:
ISrare rbr numbers or orber ldrnrlJka(ion o/accrpsrd aMSrnam. IJdreUlons on orber alrerna(rs arf ro br made br the Owner n.bsrquenr to rbr rxrcurion of
rbtr Agrrrmrnr, armcb a schedule of rucb orber alrnnares sbou~trg rbr amount/or mcb and (br da(e until u~blib (bar amoun(tr ra(id)
BASE BID S 535,000.00
ALT. N0. 1 2,250.00
S 537,250.00
4.3 L'ni[ price, U any, are as follows: N /A
AIA DOCUMENT A101 • OWNER-CONTR{t;TOA AGREE~IE\T • T~L'ELfTII EDITION • AIA~ • 014N7
TIIE AMERICAS LCSTITUTE OP ANCI IITECTS. I'}S SEW 1'OAR A1'ESt.'E. S.W., Ix'ASI IINGTON, D.C. VMN16
A101.1987 3
WARRINQ; Un11NMW Plwlocapybq vlOligs U. S. COpynahl laWf anO if lubleC110 Neal prOSeCU[lOn.
ARTICLE 5
PROGRESS PAYMENTS
5.1 (iaecd upon .lpplic:Uiun+ fur Paymrm ;ubmrtted to the :\rchitert by the Omtnctur and Crrntii:ncs ti,r Pagmrnt issued by the
{.: •.mtcct. the O~~ncr shall (Tlakr pfUgfeSti ~ acmenK U^ aCl•OUnt Ut the t.Untract tiU(11 IU the Q)(lt[eCIUf al pro ylded bCIUa' and
• :!.exhcre in thc• ~on:[aa Documents.
5.2 "Che period cu~rrcd by each Applinuun for Payment (hall be one c:Jendar month ending on the laa day ut the month. or v
tLllu•xs.
N/A
5.3 Provided an Application for Payment u received by the Architect not later [han the 25th
day of a month, the Owner shall make payment to the Contractor not later than
the 2~ ~ day of the f7Q1.1QN1iYJ month. If an Applcation for Payment u received by the
.{rchitcct after the applica[ion date fixed above, payment shat{ be made b}' the Owner not later than t0 );)e determined
• days af[er [he Architec[ receives the Application for Payment.
5.4 Each Application for Pa}•men[ shall be based upon the schedule of glues submitted by [he Contractor in accordance with
the Concracc Drxumrnts. The schedule of glues shall alloca[e the emire Comratt Sum among the various portions of the VGbrk
and he prepare) in wch form and supponed by such data to subs[amiuc its accunq• u the Architect may requ i re. This schedule,
unless objected ro by the Architect, shall be used u a buts for rryiea•ing the Contractor's Applications for Payment.
5.5 Applicuions for Paymen[ shall indinte the percentage of eompleUOn of nth portion of the ~ti'ork u of [he end of the period
covered by [he Application for Pn•mcnt.
5.6 Subject to the proytcions of the Contnct Documents, the amoun[ of each progress pa}•ment shall be computed as follows:
5.6.1. TakethatportionoftheContnct5umproperlyallocabtetocOmpletedVibrkudecerminedbymukiplyingtheperccnnge
completion of each portion of [he VGbrk b)-the share of [he total Contnct Sum allorrted to [hat por[ion of the VGbrk in the schedule
of vvlues. less rctainage of tell percent
( 10 %). Pending final determination of cos[ to the O~•nerofchanges in the VGbrk. amounts not in the dispute maybe
included u provided in Subparagraph ?.3.' of [hc Genenl Conditions even though the Contnct Sum has not }~ec been adjusted
by Change Order:
5.6.2 Add that portion of the Contnct Sum properly allocable to materials and equipment delivered and suitably stored ac the
site for subxquen[ incorporation in the completed conswctton (or, If approved in adyutce b}'the Owner, suitabh• stored off [he
liar at a lorniun agreed upon in a•ri[ing). less rctainage of teri
percen[ ( 10 %);
5.6.3 Subtract the aggregate of previous payments made by [he Owner; and
5.6.4 Subtract amounts, If any, for which the Architect hu withheld or nullified a Certlfiea[e (or Paymem u provided in Pan-
graph 9S of [he Genenl Conditions. '
5.7 The progress payment amourn determined in acrnrdance wl[h Paragraph i.6 shall be funher modified under the following
cirnimsnnccs:
5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to ninety
percen[ ( 9Q %) of [he Contratt
Sum, less such amounts u the Architect shall determine fdr incomple[e Work and unxttled claims; and
5.7.2 Add, if final completion of the \r'ork is thererfrcr materially delayed [hrough no taut[ of the Contractor. any additional
:unounu payable in accordance with Subparagraph 9.10.3 of [he General Conditions.
5.8 Reduction ur limitation of rctainage, if any, shall be of follows:
I// rl (.• unrndpd. pru,r (r. \IIII%(UNII(r/ CUnr(rlrf%frrl 1~ (tY t•NbrC tVhlM, rb /fY(rlfC Ur II/qIl NW 4'(rffllrrxl' /Cf(//l1II/(rroM Ilk'r1t9Ct'rlrfrJ4•f IrUI'Il{'r/ II/ .14frIMrrN
.l'ryq•/r• t M1. /and i. 1. J uMgr. r1rlr/ (/,lx !f nu( vc(,/nire'r/ t'/xaWrt•/a' u( r/h• Cuu(rn(( INiI'u,uenfs. (uFOrf 4t•rr /VLf'/YIOILi~? iut'p redufrimr nr limilulir.n./
N/A
•
AIA DOCUMENT A101 • U{i VEN {.{rv'1lt.U:'I'{ rR 1GaE1!?th'.~'f ~ '1'a'eLP'1'II lil )I'I'n t\ • \L\' ~ .L ton'
nit {)Irt(u ).I..nn rr.r,r )a{nrrht r..r-u.ea r„e~.wr~tl•:.n'x.atan.rnr..ut:._,r^rr, A101-1987 4
WARNING: UnikfnacE pnotocopylnp vlolslff U.S. copyngM lawf m0 n futgacl to Ifgal profecution.
ARTICLE 8
FINAL PAYMENT
Ftnal payment. rons(iwting the entire unpaid balance of the Contact Sum, shall he ma(Ie by the Owner to the Contracwr when (1)
• thr Cunttact has been fully performed by the Contactor excep[ fur the Convector's responsibility ro correct nonconforming
K~ork u provloed in Subparagraph 1?.?.? of the General Conditions and [o satisfy other requirements, if any, which necessarily
survive foul payment: and (=) a final Certificate for Payment has been issued by the architect: such final payment shall be made by
(hc Owner not more than ~0 days after the issuance of the Architect s final Certificate for Payment, or as follows:
N/A
ARTICLE 7
MISCELLANEOUS PROVISIONS
7.1 vthere reference Ls made in [his Agreemrnt to a provision of the Genetl Condi[IOns or another Con[na Doatment, the ref-
erence refers to the[ proviion u amended or supplemen[ed by other provisions of the Con[nct Docvmenrs.
7.2 Pa;•men[s due and unpaid under the Cantnct shall beu Interest from the date pa}•ment is due at the rate stated below, or In
the absence thereof, a[ the legal rate presalling from time to [ime at the Platt where the Pro(ect is located.
/Auerl rare u/ inMrrfr npreed upon. // arq•.)
N/A
ICJaIy Ira PJ and/rgabrllrrnrf altdrl lbr Pfdrnl TNrb In Lrndl! ACr,l/mlrar JraN andrtlrarCOlUamrl Clyd/r raYY and Olbrr lrgWGHOmmr6r Oa'nrlfalld
Conrraaor } pr/nNpalplaca u/butlnru. /br forallon u/ rbt Pro~rrr and Nnu~brrr may a//rcr r/x rplld/ry o/rb/sprorhlon. Lrgal aarkr rbordd br obra/nrd
virb rerprrr ro dNetlonl ur modl/ICaI/mu, and aho rrgard/res nqurnmenrr furb at udflrn dUdotum or un/turn)
7.3 Other provisions:
N/A
ARTICLE 8
TERMINATION OR SUSPENSION
• 8.1 The Contract may be terminated by the Owner ur the Convector a pro(9dw1 in Article la of the General Conditions.
B.2 Thr tCbrk mar he wspcnded by the Oe•ncr as pnrvWcd in Artklc h of the General Conditions.
AIA DOCUMENT A101 • U4'VF:k (;UVTaACTnk .u:a EEMEV'r • TR'ELYTII EOITI(N(• .U:v` . t, pro-
TIIE.(1IF.NIt:.[?IS~TITI.TE OF nktallt'El.r%.1•t(SEVr 1'UNK d1'Y:NCE,BW., WA5111.`1UT(/S.O I: aMMV, A101.1987
WARNING: Unlicanfrd pnoloeopylnq vlolaba U.S. Copyrlgnl lava ono rs su01ae1 to Ipal pn)facullon.
ARTICLE 9
ENUMERATION OF CONTRACT DOCUMENTS
• 9.1 The Convact Documen[s. except for ModiOcaeions issued after execution of [his Agreement. ere enumenred ss follows,
9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contnaor, ALi Document A101. 198;
Edition.
9.1.2 The General Conditions are [he Genetal Conditiotu of the Con[nc[ for Cons[tvction, ALA Document A201, 1987 Edition.
9.1.3 The Supplementary and ocher Conditions of the Con[na ue [hose mntalned in the Project J[anual dated
JANUARY, 1999 ,and ue az follows:
Document
Title
Pages
9.1.4 The SpeNfications ue [hose con[ained In the Projec[ Manual dated as In Subpuagnph 9.1.3, and ue az follows:
/flrbrr /ISf fbt SfxYl/(cwli4m rxrr 4r re/rr r4 an arblblr nrracMd r4 ibis Agrrrmoll.J
Section Title Pages
SEE ATTACHED EXHIBIT "A"
r1
L~
AIA DOCUMENT Af01 • OwNEA•COxTRACTOR AGREEMENT • TWLLFTH EDITION • AIAe • OIg87 AlO1.1987 s
TIIE AMERICAN INXTITCTE OF ARCHITECTS, 1'!t SEti' YORK APENUl, N.W., VI'ASfIINGTON, D.C. tgtxK~
WARNING: Unlleenes0 pholocopylnq vlolelee U.9. eopyrlghl levn end le sublecl to Ngel prosecution.
•
•
9.1.5 'I"he Urao'ings are :~. Cul4 nvs, and arc d:ucd
• Ollpo' hA lIW /htm IqA! hprp nr rclrr hr Un ['.CLlhrt OlhKhrd b. :14• .1,1"Yr•rpert r
Vumber Title
SEE ATTACHED EXHIBIT "B"
9.1.6 The atlcknda, if:my, arc as follo\\s:
\umber
H1
#2
Date
3/29/99
4/01/99
Date
Pages
8
5
li lyduns of addenda relating w bidding requtrcments an not ryart of the Cuntrlc[ Ducumen[s unlw the biLlding rcquinnlcnts arc
aho cnunlcrucd in this .\rticlc'J.
AIA DOCUMENT A101 • UWNEN~CUNTM6TUR AGNEENE~T • Ttt'ELPTII P.DITION • AIAa • OIUN'
TIIE ANENI<:A\ L\+TITI'TE OF ARCIIITP.Ct'S. 1'y5 \EM' 1'DEK A\'ESI'E. V R'., VI'AtiI11NGTO8, D.C.:aMr. A1O1-1987 ~
unln.\ a Jitl'crcnc date i%.~~on bcluo.
WARNING: UnlleaMad pholxoprlnq vlo4gs V.B. eopydght laws and Is sugsct to bgal proweutlon.
9.1.7 Odter documents, iC soy. forming part of thr Convact Drxumaas arc :u tillluaes:
(Lrsf bprv.u(p udJnu.udl d~KUrnavrl.. u Inds roe artrrtrlad m/ vm (urrf rd nx• Giunruef (}x nman!< 7Ih• rivneru(Q.nJtlmn.. (n.urJr U.vrr hrddrng q~ynrrc.nenGr rude
ut nJrrrrrnnra•nr nnnrtlunnn rn hiJ. hrtbn[honi ui quGkrl, !nm(r(p~rrms nrrrl f/x•Qmbncfnr} hat urv rurt purr /r/x• L:vurmf ll,xnniavrf. un/vm vnunrerrrxvl
br Unt Ay;rat•rnenf. Ah'V f/xndd Ix• fi.rxvl /x•re nuly i) urlerulal fu ha• (xrr! u) lha• Cunf/tlQ (AK rnrra•nta. l
•
This Agreement b en[ered into as of the My and year first written above and u executed In at least three original copies of which
one is to be delivered to the Contractor, one to the Architect for Ilse In the adminlstntion of the Contnct, and the remainder [o the
Owner.
OWN CQ! t, OR
`/ ~`
(Stgnar .e) (Stgnamre)
.~1~ /a• ~,~,+-4~~,, 1/,e~ -M~,r.,c /ri~~e-~ JC~/.~~~rZ ~,~Ef.
(PrtnteA rulnle a/rQ tftfe) (Printed name and fllfr)
• t 1 CAUTION: You should sign an original AIA document which has this caution printed In red.
-An original assures that changes will not be obscured as may occur when documents are reproduced.
AIA OOCVMaHT Af0/ • OWNER~CONTRAGTOR AGREEMENT • TWELFTH lDITION •AIA• • 019x'
THl AMERICAN INSTITUTl Or ARCHITECTS,I7)SNlK'YORK AVENUl, N.9Y., WASIIINGTON, D.C.aWr16 A1O1~1997 B
WARNING: UNICeneed ph0looopylna vlolalee US. Copyrlaht levee and Is fubleet to Nyal proeeoutbn.
~ECTIOrr o~~o~~a-_
TABLE OF COCITEMTS EXHIBIT "A"
The General Contractor shall be required to compare this Table of
Contents with the bound Project Manaal for legibility, omission
or inclusion of any part of any section listed herein. It shall
. be the General Contractor's responsibility to request, in
writing, clarification from the office of the Architect.
Clarifications shall be addressed by addenda to all who are
registered with the Architect as having received Bidding
documents.
DIVISION/SECTION DIVISION/SECTION PAGE NUMBERS
NUMBERS TITLE
DIVISION 00 - BIDDING DOCUMENTS
00001 TITLE PAGE
00002 TABLE OF CONTENTS
INVITAION TO BID
INSTRUCTIONS TO BIDDERS
BID FORM
CONTRACT FORMS
CONTRACTOR
GENERAL CONDITIONS OF THE CONTRACT FOR
CONSTRUCTION
STANDARD FORM OF AGREEMENT BETWEEN OWNER AND
SUPPLEMENTAL GENERAL CONDITIONS
00850 LIST OF DRAWINGS
DIVISION O1 - GENERAL REQUIREMENTS
01010 SUMMARY OF THE WORK
01016 CONTINUED OCCUPANCY OF EXISTING FACILITIES
01040 COORDINATION
01095 CUTTING AND PATCHING
01100 ALTERNATES AND ALLOWANCES
01210 PROCEDURES AND PERFORMANCES
01390 SUBMITTALS
01510 TEMPORARY UTILITIES
01590 CONSTRUCTION FACILITIES
01610 MATERIALS AND EQUIPMENT
01630 PRODUCT OPTIONS AND SUBSTITUTIONS
01711 CLEANING
01720 PROJECT RECORD DOCUMENTS
DIVISION 02 - SITEWORK
02060
•
DEMOLITION
01-99
SECTION 00002-3
TABLE OF CONTENTS
DIVISION 03 - CONCRETE
03200 CONCRETE REINFORCEMENT
• 03300 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
09100 MASONRY MORTAR
09150 MASONRY ACCESSORIES
04200 CONCRETE UNIT MASONRY
09930 CAST STONE
DIVISION 05 - METALS
05210 STRUCTURAL STEEL
05500 METAL FABRICATIONS
DIVISION 06 - WOOD AND PLASTICS
06100 ROUGH CARPENTRY
06200 FINISH CARPENTRY
06400 ARCHITECTURAL CASEWORK
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07190 UNDERSEAS VAPOR BARRIER
07200 BUILDING INSULATION
07290 FOAM FINISH SYSTEM
07900 JOINT SEALERS
DIVISION OB - DOORS AND WINDOWS
08110 STEEL DOORS AND FRAMES
08210 WOOD VENEER DOORS
08305 ACCESS DOORS
08910 ALUMINUM ENTRANCES AND STOREFRONT
08700 FINISH HARDWARE
08800 GLAZING
DIVISION 09 - FINISHES
09110 LIGHT GAUGE METAL FRAMING
09220 PORTLAND CEMENT PLASTER/STUCCO
09250 GYPSUM BOARD
09300 CERAMIC TILE
09510 ACOUSTICAL CEILINGS
09680 CARPETING
09900 PAINTING
09950 WALL COVERINGS
•
01-99
~~~rtorr >>oo?-r
TABLE OF CONTEirTS
•
•
DIVISION 10 - SPECIALTIES
10100 TACKBOARDS
10155 SOLID PLASTIC TOILET PARTITIONS
10440 SPECIP.LTY BUILDING SIGNRGE AND GRAPHICS
10500 WOOD LOCKERS
10520 EIRE EXTINGUISHERS
10700 FABRIC AWNINGS
10800 TOILET ACCESSORIES
DIVISION 11 - EQUIPMENT
NOT USED
DIVISION 12 - FURNISHINGS
12510
WINDOW TREATMENTS
DIVISION 13 - SPECIAL CONSTRUCTION
NOT USED
DIVISION 14 - CONVEYING SYSTEMS
NOT USED
DIVISION 15 - MECHANICAL
15010 MECHANICAL SYSTEMS
15015 SUMMARY OF MECHANICAL WORK
15090 TESTING, BALANCING AND CERTIFICATION
15060 PIPING AND PIPE FITTINGS
15402 SOIL, WASTE AND VENT PIPING
15903 DOMESTIC WATER SYSTEM
15950 PLUMBING FIXTURES AND TRIM
15500 FIRE PROTECTION
15870 AIR DEVICES
DIVISION 16 - ELECTRICAL
16010
16111
16120
16139
16190
16170
16722
16790
16990
END OF SECTION
01-99
ELECTRICAL SYSTEMS
CONDUIT
WIRE AND CABLES
PANELBOARDS
SWITCHES AND RECEPTACLES
SAFETY SWITCHES
FIRE ALARM SYSTEM
TELEPHONE SYSTEMS
TESTING
LIST OF DRAWINGS EXHIBIT ~~e~~
Cover Sheet N/A
C-1 Site Plan 1/ 2 6/ 9 9
LS-1 Life Safety Plan 3/2/99
Architectural
A-1 Demolition Plan and Overall Floor Plan 3 / 2 / 9 9
A-2 Overall Floor Plan 3/ 2/ 9 9
A-3 Partial Floor Plan 2 / 10 / 9 9
A-4 Elevations, Sections and Details 3/ 2/ 9 9
A-5 Schedules and Details 3/ 2/ 9 9
A-6 Reflected Ceiling Plan 2 / 10 / 9 9
Interior Design
ID-1 Interior Finish and Furniture Plan Enlargement 1 / 14/ 99
ID-2 Interior Finish and Furniture Plan Enlargement 1 / 14/ 99
ID-3 Interior Elevations 1 / 14 / 9 9
ID-4 Interior Elevations 1/14/99
ID-5 Interior Elevations 1 / 14 / 9 9
ID-6 Interior Elevations 1/14/99
ID-7 Interior Elevations 1/14/99
ID-8 Interior Elevations 1 / 14 / 9 9
IC-1 Cabinetry Details 1 / 14 / 9 9
IC-2 Cabinetry Details 1 / 14 / 9 9
Mechanical /Electrical
ME-1 Mechanical /Electrical Schedules and Notes 1 / 2 6 / 9 9
M-1 HVAC Plan 1/26/99
• M-2 Plumbing Plan 2/22/99
M-3 Plumbing Isometrics 2/ 2 2/ 9 9
E-t Electrical Plan 2/22/99