R2018-14 Water Club PUD AmendmentRESOLUTION 2018-14
A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF
NORTH PALM BEACH, FLORIDA APPROVING A MINOR AMENDMENT TO
THE WATER CLUB PLANNED UNIT DEVELOPMENT; AMENDING THE
APPROVED SITE, CIVIL, ARCHITECTURAL, AND LANDSCAPING PLANS
TO REFLECT A REDUCTION IN THE FOOTPRINT OF TOWER III AND THE
AS -BUILT LANDSCAPING CONDITIONS FOR TOWERS I AND II; PROVIDING
FOR CONFLICTS; AND PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, through the enactment of Ordinance No. 2016-03 on January 14, 2016 ("Amended
PUD Ordinance"), the Village Council approved an amended Water Chub PUD to include a third
tower on an additional 1.26 acres for a total of 172 condominium units and 20 townhome units; and
WHEREAS, Section 8 of the Amended PUD Ordinance provides that the Village Council may
approve minor modifications to the PUD by resolution without the necessity of review by the
Planning Commission, advertisement or public hearing; and
WHEREAS, the Applicant, Domani Development, LLC, is requesting minor modifications to the
PUD to amend the approved site, civil, architectural, and landscaping plans to reflect: (1) a reduction
in the footprint of Tower III (and a reduction of eight parking spaces); and (2) revisions to the
landscaping plans to show the as -built conditions for Tower I and Tower II and minor revisions
to reflect the change in the footprint of Tower III; and
WHEREAS, the Village Council determines that the request meets the definition of a minor amendment
to the PUD and that the adoption of this Resolution is in the best interests of the residents and
citizens of the Village of North Palm Beach.
NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE
OF NORTH PALM BEACH, FLORIDA as follows:
Section 1. The foregoing recitals are ratified as true and incorporated herein.
Section 2. As authorized by Section 8 of Ordinance No. 2016-03, the Village Council hereby
approves minor modifications to the Water Club PUD by adopting the following revised plans:
A. Architectural Plans prepared by BC Architects AIA dated December 1, 2017, consisting
of the following:
Z1.00
Master Site Plan
Z1.01
Combined Site Data
Z1.03
Phase II Data
Z2.10
Phase II Site Plan
Z2.11
Phase II
— Garage Level 1
Z2.12
Phase II
— Garage Level 2
Z2.13
Phase II
— First Floor Plaza
Z2.14
Phase II
— Floor 2
Z2.15
Phase II
— Floors 3-16
Z2.16
Phase II
— Main Roof Level
Z3.10
Phase II
— Building 6 — West Elevation
Z3.11
Phase II
— Building 6 — South Elevation
Z3.12
Phase II
— Building 6 — East Elevation
Z3.13
Phase II
— Building 6 — North Elevation
Z4.10
Phase 11—
Building 6 — Building Section
Page 1 of 2
B. Landscape Plans prepared by Intuitive Design Group (IDG) dated December 22, 2016
and last revised on December 1, 2017 consisting of eight.(8) pages (LP 1 through LP 8).
C. Photometric Plans prepared by Main Street Engineering dated March 27, 2014 and last
revised on December 18, 2017 consisting of the following:
PHI Site Plan
PH4 Pole and Fixture Detail
PH5 Enlarged Photometric Plan
PH6 Photometric Table
D. Engineering Plans prepared by Thomas Engineering Group dated December 12, 2017 and
consisting of the following:
C-01 Overall Paving, Grading and Drainage Plan
C-02 Phase II Paving, Grading and Drainage Plan
C-03 Overall Water and Sewer Plan
C-04 Phase II Water and Sewer Plan and Profile
Section 3. To the extent not expressly modified herein, all other provision of the Amended
PUD Ordinance shall remain in full force and effect.
Section 4. This Resolution shall take effect immediately upon its adoption.
PASSED AND ADOPTED THIS 22ND DAY OF FEBRUARY, 2018.
(Village Seal)
ATTEST:
VILLAGE CLERK
Page 2 of 2
'L 0"'y"
MAYOR