HomeMy WebLinkAbout1996-062 Logan Contract Change Order•
•
•
RESOLUTION NO. 62-96
A RESOLUTION OF THE VILLAGE COUNCIL
OF THE VILLAGE OF NORTH PALM BEACH,
FLORIDA, AUTHORIZING AND DIRECTING
THE MAYOR AND VILLAGE CLERK TO ENTER
INTO A CHANGE ORDER ATTACHED AS
EXHIBIT "A" TO THE VILLAGE CONTRACT
WITH MURRAY LOGAN CONSTRUCTION, INC.
FOR THE SHORELINE PROTECTION
PROJECT, WHICH CHANGE ORDER ADDS
CONSTRUCTION OF APPROXIMATELY 100
FEET OF RIP -RAP ALONG THE SHORELINE
AND INCREASES THE TOTAL CONTRACT
PRICE FROM $244,596.00 TO
$370,514.61; AND, PROVIDING FOR AN
EFFECTIVE DATE.
BE IT RESOLVED BY THE VILLAGE COUNCIL OF NORTH PALM
BEACH, FLORIDA:
Section 1. The Village Council of the Village of North
Palm Beach, Florida, does hereby approve the Change Order attached
as Exhibit "A" to the Village Contract with Murray Logan
Construction, Inc. for the Shoreline Protection Project, which
Change Order adds construction of approximately 100 feet of rip -rap
along the shoreline and increases the total contract price from
$244,596.00 to $370,514.61.
Section 2. The Mayor and Village Clerk are hereby
authorized and directed to execute the Change Order to the Village
Contract with Murray Logan Construction, Inc. set forth in Exhibit
"A" for and on behalf of the Village of North Palm Beach.
•
Section 3. This Resolution shall take effect immediately
upon its adoption.
PASSED AND ADOPTED THIS 26th DAY OF SEPTEMBER
a--7/(27,40
1996.
(Village Seal)
ATTEST: /iA—ettei .� VILLAGE CLERK
•
MAYOR
c
CHANGE ORDER
(Instructions on reverse side) - .No 1
PROJECT NPB Shoreline Protection
DATE OF ISSUANCE EFFECTIVE DATE -
OWNER
Village of North Palm Beach, Florida
OWNER's Contract No. 92-096 (EYtgr s. NO.)
CONTRACTOR EN
Murray Logan Construction,Inc.
ENGINEER Lindahl,Browning,Ferrari & Hellstrom,I:
You are directed to make the following changes in the Contract Documents.
Description: Add 100 1.f. of Rip -Rap & Reconstruct Green No. 1 and No.2 Tee
Reason for Change Order: Scc Attached Mettbrandtun
Attachments: (List documents supporting change)
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price Original Contract Times
Substantial Completion
Ready for final payment:
244,596.00
Octolrr 28, 1996
November 27,1996
days or Ames
Net changes from previous Change Orders No — to No = Net change from previous Change Orders No ^ to No —
S days
Contract Price prior to this Change Order
244,596.00
Net Increase (decrease) of this Change Order
$ 125,918.77
Contract Price with all approved Change Orders
s
370,514.61
R ECOAS,IEN�Ery��J
By.
_ grker (Au ho
rized Signature)
Date:
Contract Times prior to this Change Order
Substantial Completion: Oetoh'r 28, 1996
Ready for final payment: November 2/, 1996
days or dates
Net Increase (decrease) of this Change Order
0
days
Contract Times with all approved Change Orders
Substantial Completion: Octolpr 28, 1996
Ready for final payment -
November Z%� 1996-
2S.'
By QOwner (Authoriud Signature) / By: Contact r • horized Sig lure)
Dater I'"+ Dale:
days or dates
ACCE
EJCDC No. 1910--8-B (1990 Edition)
Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America.
CHANGE ORDER
INSTRUCTIONS
A. GENERAL INFORMATION
This document was developed to provide a uniform format for handling contract changes that affect Contract
Price or Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into
a subsequent Change Order if they affect Contract Price or Times.
Changes that affect Contract Price or Contract Times should be promptly covered by a Change Order. The
practice of accumulating change order items to reduce the administrative burden may lead to unnecessary
disputes.
If Milestones have been listed any effect of a Change Order thereon should be addressed.
For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Times,
a Field Order may be used.
B. COMPLETING THE CHANGE ORDER FORM
Engineer initiates the form, including a description of the changes involved and attachments based upon
documents and proposals submitted by Contractor, or requests from Owner, or both.
Once Engineer has completed and signed the form, all copies should be sent to Contractor for approval. After
approval by Contractor, all copies should be sent to Owner for approval. Engineer should make distribution of
executed copies after approval by Owner.
If a change only applies to Contract Price or to Contract Times, cross out the part of the tabulation that does not
apply.
No. Description
1
2
3
Clearing and
Grubbing,
Including Disposal
Rubble Removal
Off -Site Fill (In
place &
Compacted)
4 Furnish & Place
Filter Fabric &
Rubble Rip -Rap
Including Grading
5 Replace Concrete
Golf Cart Path
6 1 Seed & Mulch
7 Bahia Sod
8 I Tiftwav 419
9
Reconstruct No. 1
Green & No. 2 Tees
Totals
Estimated
Quantity
Before This
Change Order
1
Exhibit No. 1, Change Order No. 1
NPB Shoreline Protection Project
Unit Unit Price Estimated
Amount Before
This Change
Order
L. S.
1 1 L. S.
10,000
1,550
500
31,000
15,000
25,000
C. Y.
L. F.
Sq. Ft.
So. Ft.
So. Ft.
Su. Ft.
L. S.
10,110.00
29,066.00 ,
4.75
90.00
5.00
0.07
0.25
0.40 I
110,688.00
10,110.00
29,066.00
47,500.00
139,500.00
2,500.00
2,170.00
3,750.00 I
10,000.00
244,596.00
Additional
Quantities By
This Change
Order
0.0645
0.0645
645
100
0
0
0
1,600
1
Total Estimated
Quantity With
This Change
Order
1.0645
1.0645
10,645
1,6506
500
31,000
15,000
26,600 I
1
Estimated
Amount With
This Change
Order
10,762.10
30,940.76
50,563.75
148,500.00
2,500.00
2,170.00
3,750.00
10,640.00
110,688.00.
370,514.61