HomeMy WebLinkAbout1992-18 FIND Waterways Assistance Program-Shoreline Protection CClubRESOLUTION NO. 18-92
RESOLUTION FOR ASSISTANCE
UNDER 'l'IIL FLORIDA INLAND NAVIGATION DISTRICT
WATERWAYS ASSISTANCE PROGRAM
Village of
WHEREAS, THE North Palm Beach 1.s interested in carrying out the
(Name of Agency)
following described project for the enjoyment of the citizenry of North Palm Beach
end the State of Florida:
Project Title Shoreline Protection - Country Club
Total Estimated Cost $ 48,400.00
Brief Description of Project: Copy attached
AND, Florida Inland Navigation District financial assistance le required
for the program mentioned above,
NOW THEREFORE, he It. resolved by the
Village of North Palm Beach
(Name of Agency)
that the project described above be authorized,
ANI), be It further resolved that said Village of North Palm Beach
(Name of Agency)
make application to the Florida Inland Navigation District In the amount of
50 % of the actual cost of the project In behalf of said Village of North Palm Beach
AND, be Lt further resolved by the Village of North Palm Beach
. (Name of Agency) ,
that 1t certifies to the following:'
1. That IL will accept the terms and conditions set forth 1n FIND Rule
I6T-2 F.A.C. and which will be c) part of the Project Agreenignt for any
assistance awarded under the attached proposal.
III
FIND - Form No. 90-21
Rev. 9- 1 5-90
2. 'That. it Is In complete ncc:ord with the attached proposal and that it
will carry out the Program In the manner described In tho.proposnl and any
plans and specifications attached thereto unless prior approval for any change
Itas been received from the District.
3. Thal it has the ability and l steal ion to finance Its share of the
cost of the
project and that the project will be operated and maintained at
the expense of sold Villaee of North Palm Beach for public use.
(Name of Agency)
4. That It will not discriminate against any person on the basis of
race, color or national origin in the use of any property or facility acquired
or developed pursuant to this proposal, and shall comply with the terms and
Intent of the 'Title VI of Lite Civil (tights Act of 1964, P. I.. 88-352 (1964)
and design and construct all facilities to comply fully with statutes relating
to accessibility by handicapped persons as well as outer federal, stale and
local laws, rules and requirements.
5. That IL will maintain adequate financial records on the proposed
project to substantiate claims for reimbursement.
6. That it wi11 make available to FIND Lf requested, a post -audit of
expenses incurred on the project prior to, or in conjunction with, request for
the final 10% of the funding agreed lo by FIND.
This Is lo certify that the foregoing Is n true and correct. copy of a
rennlullon duly and legally adopted by the Vi11ag'e of NPB at a
legal meeting held on this 23rd day of April 1992.
:nature
MAYOR
'title
47 11J r r_r.
Signature
J
VILLAGE CLERK
'title
nS a_ 1992 I5:IE
FROM HOWARG L. SEARCY. PE TO 6817469
r
PROPOSED SHORELINE PROTECTION PROJECT
NORTH PALM BEACH COUNTRY CLUB
ALONG INTRACOASTAL WATERWAY
SCOPE OF ENGINEERING SERVICES REQUIRED
1. Project Description
The Village of North Palm Beach wishes to construct a
shoreline protection system adjacent to the municipally owned
public golf course which fronts on the south bank of the
Intracoastal Waterway on from the U. S. 1 bridge westerly
approximately 2,000 feet. Erosion of the bank in this area has
progressed over the last 15-20 years to the extent that it now
threatens some major natural trees along the south shoreline and
has encroached into the play area of the golf course in this
area. continued progressive erosion could seriously damage the
vegetation in this area and the publicly owned golf course of the
Village of North Palm Beach:
II. Preliminary Engineering Requirements
A. Prepare survey of site showing south property line and
shoreline of the Intracoastal Waterway and cross -sections from
ground level on the south side to a 6' depth in the waterway.
B.
proposed
C.
animals
effected
Soil borings sufficient to ascertain soil conditions in
construction areas within the project limits.
Environmental survey including terrestrial plants and
as well as esturine plants and animals that would be
by the project.
D. Research previous investigations and studies of
conditions in this particular area.
III. Conceptual Design
a. Investigate alternative protection methods including,
but not limited to, rip -rap protection, seawalls „ a combination
of seawall and rip -rap, manufactured shoreline systems and other
potential protection methods. Evaluate costs and effectiveness
of each alternative method.
, JS 1: _ 7511E.
FRO? HOtfiR[' L. SEARCY. PE
TO 8817469
F .O:
•
I
HRH
b. Prepare preliminary plan and cross -sections of proposed
protection method• and preliminary ,details required for
permitting.
c. Prepare
construction.
d. Prepare
the project.
detailed cost estimates of proposed
design, permitting and construction schedule for
IV. Permitting and.approvals
Prepare and file application for FIND grant, and if approved
proceed with filing V. S. Army Corps of Engineers, Florida
Department of Environmental Regulation, Palm Beach County
Department of Environmental Resources Management and other
required permits for the project.
fi
V. Construction Plans and Contract Documents
Prepare detailed construction documents, including
construction drawings, contracts and related documents in
preparation for bidding and construction award for the project.
VI. Proposed Budget
A. Preliminary Engineering
1) Surveys, lay -out property boundaries, plot cross -
sections
$ 7,500.00
2) Soil Borings
10 auger boring to 25 feet depth 1,800.00
3) Environmental survey 2,500.00
4) Coordination and research 1,500.00
$13,300.00
,
64.O.,19?2 15:17 FROM HOWRPD L. SEARCY. PE
TO 0817469 F.04
B. Conceptual Design
1) Alternative designs 4,500.00
2) Preliminary design of selected alternate
5,000.00
3) Cost estimate 1,500.00
4) Schedule 500.00
$11,500.00
C. Permitting
1) Corps of Engineers 3,500.00
2) Florida Department of Environmental Regulation
5,000.00
3) Palm Beach County Department of Environmental
Resources Management
3,500.00
$12,000.00
D. Construction Plan and Contract Documents
1) Construction plans
2) Contract documents
Total
8,500.00
3,500.00
$12,000.00
$48,400.00
HOWARD L. SEARCY
CONSULTING ENGINEERS
2000 PALM BEACH LAKES BOULEVARD
SUITE 702
WEST PALM BEACH, FLORIDA 33409
APRIL 2, 1992