HomeMy WebLinkAbout1981-58 Award Bid to Ranger Construction Industries, Inc.RESOLUTION NO. 58-81
A RESOLUTION OF THE VILLAGE COUNCIL OF NORTH PALM BEACH,
FLORIDA, ACCEPTING THE BID OF RANGER CONSTRUCTION INDUSTRIES, INC.,
FOR THE WIDENING AND RESURFACING OF LIGHTHOUSE DRIVE FROM PROSPERITY
FARMS ROAD TO WEST VILLAGE LIMITS, IN THE AMOUNT NOT TO EXCEED
$36,000, FROM ACCOUNT NO. 34-541-46.83 (WIDEN/OVERLAY-LIGHTHOUSE DRIVE).
BE IT RESOLVED BY THE VILLAGE COUNCIL OF NORTH PALM BEACH,
FLORIDA:
Section 1. The bid of Ranger Construction Industries, Inc.,
copy of which is attached to this Resolution, is hereby accepted by
the Village of North Palm Beach in accordance with its terms. The
appropriate Village officials are hereby directed to advise said
bidder of this acceptance. The monies are to be expended from
Account No. 34-541-46.83 (widen/overlay-Lighthouse Drive).
Section 2. This Resolution shall take effect immediately
upon passage.
PASSED AND ADOPTED THIS 22nd DAY OF OCTOBER, 1981.
MAYOR
ATTEST:
VILLAGE CLERK
•
VILLAGE OF NORTH PALM BEACH
AGENDA MEMORANDUM
THIS FORM WITH SUPPORTING DOCUMENTS MUST BE IN THE VILLAGE MANAGER'S
OFFICE BY NOON MONDAY FOR CONSIDERATION ON THE FOLLOWING THURSDAY.
FROM PUBLIC SERVICES. DEPARTMENT.
Please consider for the Village Council Workshop agenda of
Regular Agenda of 22 October 1981,
(date)
1. Proposed Agenda Title and Description: Consider award of contract to
Ranger Construction Industries, Inc., for the wiuen uiy ana resurfacing or
Ligntnouse urive from rrosperity farms wad to West Village limits, Dasecl on
Palm Beach County contract, not to exceed $36,000,
2. If Bid Item - Amount Budgeted and Account Number:
34-541-46.83 S36,000.00
3. Recommendation and Justification: Recommend award of contract to Ranger
Construction Industries, Inc. based on Palm -Beach County contracts to wider,
and resurface Lighthouse Drive from-Prosperity'Farms Road to:wes-t Village
limit line, in an amount not to exceed $36,0.00. to be expend from account
number 34-541-46.83
r4.
Eight copies of documents, detailed cost estimates, maps, etc.,
supporting each should be attached.
C.R, O'Meijia, P.E.
DEPARTMENT HEAD
Date: October 12, 1981
WORKSHOP . REGULAR
Item Number Item Number
Agenda Date Agenda Date
Action Action
1
Ranger
Construction
Industries, Inc.
WEST PALM BEACH, FLORIDA
Southern Boulevard At Rubin Road, P.O. Box 15065, West Palm Beach, Florida 33406, Telephone 793-9400
October 7, 1981
Village of North Palm Beach
Public Services Department
645 Prosperity Farms Road
North Palm Beach, Florida 33408
Att: Mr. Charles O'Meila, P.E.
Building Official
Gentlemen:
This is to advise that Ranger Construction Industries, Inc. is agreeable
to construction and resurfacing of various projects within the Village
of North Palm Beach under our current Palm Beach County Blanket Purchase
Orders, as follows:
P.O.# 28686 Contract for furnishing, hauling and placing
surface course and sand asphalt hot mix.
P.0.# 27967 Prime contract for equipment rental and
construction crews.
P.O.# 27973 Alternate contract for equipment rental
and construction crews.
P.O.# 29064 Contract for construction and removal
of concrete driveways, curbs, sidewalks
and traffic separators.
P.0.# 29057 Alternate contract for furnishing and
applying bituminous material for prime/tack
coat, cover material and armour coat.
We have enclosed copies of these Purchase Orders and a copy of the Palm
beach County Districts map reflecting that the Village of North Palm
Beach lies within District One.
Village of North Palm Beach
Att: Mr. Charles O'Meila, P.E.
Building Official
Page 2.
In connection with this, the following is our estimate of the cost of the
widening of Lighthouse Drive to 24 Feet and resurfacing from Prosperity
Farms Road Westerly to the Village limits.
1. Grading for Base - Estimated cost, supervision,
labor and equipment rental
2. 4" Asphalt Base - 273 Tons @ 32.48
3. 1" lype II A.C.S.C. - 454 Tons @ 31.69
TOTAL ESTIMATED AMOUNT
Trusting this is the information you require, we are,
JRB/em
Encls.
$ 9,200.00
8,867.04
14,387.26
$32,454.30
Yours very truly,
RANGER CO`NSTRUCTION INDUSTRIES, INC.
2,2
AK ":
&Jason R. Brown
Vice President