HomeMy WebLinkAboutRes 1976-16 Award Bid to Simgo•
RESOLUTION NO. 16-76
A RESOLUTION OF THE VILLAGE COUNCIL OF NORTH PALM BEACH,
FLORIDA, ACCEPTING THE BID OF SIMGO CORPORATION FOR TWO TENNIS COURTS -
NORTH PAIM BEACH COUNTRY CLUB IN THE AMOUNT OF $21,100.00 FROM ACCOUNT
NO. 15-404.5
BE IT RESOLVED BY THE VILLAGE COUNCIL OF NORTH PALM BEACH,
FLORIDA:
Section 1. The bid of Simgo Corporation, copy of which is
attached to this Resolution, is hereby accepted by the Village of North
Palm Beach in accordance with its terms. The appropriate Village officials
are hereby directed to advise said bidder of this acceptance. The monies
are to be expended from Account No. 15-404.5.
Section 2. This Resolution shall take effect immediately
upon passage.
PASSED AND ADOPTED THIS 25 DAY OF MARCH, 1976.
ATTEST:
/s/ Dolores R. Walker
Village Clerk
1
/s/ Ronald L. Heraty
MAYOR
n
75-273 BIDDER: . ttt( o CORrb?wr pj
PROJECT: PROPOSED ADDITION TO TENNIS COURT
FACILITIES AT THE VILLAGE OF NORTH
PALM BEACH COUNTRY CLUB, PALM BEACH
COUNTY, FLORIDA
DATE: MARCi4 / S')€
BID FORM
TO: Paul J. Nicoletti, Village Manager
Village Hall, U.S. Highway # 1
North Palm Beach, Florida
Gentlemen:
The Bidder, pursuant to your Invitation for Bids for
the a:ihieef Prniect
having examined the Drawings and Specifications with related documents
and the site of the proposed Work, and being familiar with all of the
conditions surrounding the construction of the proposed Project, in-
cluding the availability of materials and labor, hereby proposes to
furnish all labor, materials, supplies, services, etc. necessary to
construct the Project in accordance with the Contract Documents,
within the time set forth herein, and at the prices stated below.
These prices shall cover all expenses incurred in performing the
Work required under the Contract Documents of which this proposal is
a part.
Item
No.
NEW COURTS
Item
1. Site Preparation & Earth-
work and Tennis Court
Construction
2. Tennis Court Surface(100%
Acrylic Color System)
Unit
Quantity Unit Price Amount
Lump Sum $
Lump Sum $ .2 90 t e'-
Continued...
MOCK, ROOS & SEARCY, INC.
CONSULTING ENGINEERS
BF-1
75-273
Item
No.
Item
Unit
Quantity Unit Price Amount
3. Tennis Court Lighting(includes
all electrical work & trenching
and backfill for conduit)
4. Fencing Work Complete
FOUR EXISTING SOUTH COURTS
Lump Sum
$ Vflo.
Lump Sum $ 3/3-0. r'
5. Resurfacing of Four Existing
South Tennis Courts(includes
surface preparation & 100%
Acrylic Color System Surface) Lump Sum $
NOTE: Owner reserves right to award the above Items of Work to
one or more Contractors. If only one Contract is awarded
by Owner for all the above Items of Work, Bidder shall do
all the Work for the Lump Sum amount of $ a( ))flr_
(include costs savings, if any, to Owner over Above prices
for one Contract being awarded to one Contractor for entire
Project).
BIDDERS MAY BID ALL OR ANY PORTION OF THE ABOVE WORK
Continued...
MOCK, ROOS & SEARCY, INC.
CONSULTING ENGINEERS
BF- 2
75-273
The Bidder, if awarded the Contract, agrees to start the Work within
p calendar days after the Proceed date the Owner designates
in the written Notice to Proceed and guarantees completion of the
Project within CO calendar days after the designated Proceed
date set by the Owner.
Bidder further agrees to pay as liquidated damages, the sum of $50.00
for each consecutive calendar day thereafter as provided in paragraph
3 of the SUPPLEMENTARY CONDITIONS Section.
If Owner's Notice of Award of this bid is mailed, telegraphed, or
delivered to the Bidder within Sixty (60) days after the
date of opening of Bids, or at any time thereafter before the Bid
is withdrawn, the Bidder agrees that he shall execute and deliver a
Contract in the form attached as required by the Contract Documents,
in accordance with the Bid as accepted, and that he shall furnish
the required Contract Security within fifteen (15) days of the
Notice of Award.
The Bidder declares that he understands that the unit quantities
shown on the estimates are approximate only and are subject to either
increase or decrease; and that should the quantities of any of the
items of Work be increased, the Bidder proposes to do the additional
work at the unit prices set out herein, and should the quantities be
decreased, he also understands that payment shall be made on actual
quantities installed at the unit prices, and shall make no claims
for anticipated profits for any decrease in the quantities. Final
quantities installed shall be determined by the Engineer upon com-
pletion of the Work.
The Bidder further declares that he understands that the Owner may
elect to construct only a portion of the Work covered by these
Documents and agrees that he shall perform that portion of the Work
for which he is awarded a Contract at the prices quoted herein.
Enclosed is Bid security required in the sum of S.%
($
which shall become the property of the Owner in the event the Agree-
ment and Bond are not executed within the time above set forth, as
liquidated damages for the delay and additional expense to the Owner
caused thereby.
Bidder acknowledges receipt of the following addenda (enter numbers):
Notice of Award should be mailed, telegraphed or delivered to the
undersigned at the Bidder's Business Address noted by the Bidder at
the end of this document.
Continued...
MOCK, ROOS & SEARCY, INC.
CONSULTING ENGINEERS
BF-3
75-273
The submission of this Bid constitutes an incontrovertible representa-
tion by the Bidder that he has complied with every requirement of
Article 3 of the INSTRUCTIONS TO BIDDERS.
The Bidder hereto has executed this Bid the day and year first above
written.
If Bid is by a Corporation:
State of Incorporation
Ft&rtcta
,(S811L),
•, ,..i,l
ATTEST':f /v. eAfi"
`('Secretary or Asst. Sec.)
By: x',A( �gn#4,1
K1/4‘13r c HitLt,P, PetSiOtoUr
(Typed or Printed Name & Title)
S1m:so Ctitrok*Teen)
�venr` ? G.A bell, tuA#?b.
PPLvn, DFAC Ce g A & , fl fl' . o
(Business Address 4 Zip -Co e
NOTE: See Article 8 of the INSTRUCTIONS TO BIDDERS for instructions
regarding the proper execution of this form.
MOCK, ROOS & SEARCY, INC.
CONSULTING ENGINEERS
BF-4