HomeMy WebLinkAboutRes 1975-35 Award Bid to Simgo Corp.RESOLUTION NO. 35-75
A RESOLUTION OF THE VILLAGE COUNCIL OF NORTH PALM BEACH,
FLORIDA, ACCEPTING THE BID OF SIMGO CORPORATION FOR RECREATIONAL
FACILITIES - TENNIS COURTS IN THE AMOUNT OF $21,312.00.
BE IT RESOLVED BY THE VILLAGE COUNCIL OF NORTH PALM BEACH,
FLORIDA:
Section 1. Items 1 through 4 of the bid of Simgo Corporation,
copy of which is attached to this Resolution, is hereby accepted by the
Village of North Palm Beach in accordance with its terms. The appropriate
Village officials are hereby directed to advise said bidder of this acceptance.
Section 2. This Resolution shall take effect immediately
upon passage.
PASSED AND ADOPTED THIS 12 DAY OF JUNE, 1975.
1
ATTEST:
/s/ Dolores R. Walker
Village Clerk
1
/s/ M. C. Love, Jr.
MAYOR
75-65
BIDDER:,Slrin(.,0 C ddePoRAtlb,i)
PROJECT: VILLAGE OF NORTH PALM BEACH, FLORIDA
RECREATIONAL COURT FACILITIES
(TENNIS - PADDLETENNIS -
RACKETBALL - HANDBALL)
DATE: Tuns E l o l 19 '7S
BID FORM
TO: Lawrence J. Robbins
Village Manager
Village of North Palm Beach
Village Hall, U.S. Highway # 1
North Palm Beach, Florida 33408
Gentlemen:
The Bidder, pursuant to your Invitation for Bids for the
subject protect.
having examined the Drawings and Specifications with related documents
and the site of the proposed Work, and being familiar with all of the
conditions surrounding the construction of the proposed project, in-
cluding the availability of materials and labor, hereby proposes to
furnish all labor, materials, supplies, services, etc. necessary to
construct the project in accordance with the Contract Documents,
within the time set forth herein, and at the prices stated below.
These prices shall cover all expenses incurred in performing the
Work required under the Contract Documents of which this proposal is
a part.
Item
No.
Item
Unit
Quantity Unit Price Amount
TENNIS COURTS AT NORTH PALM BEACH COUNTRY CLUB:
1. Site Preparation & Earth-
work and Tennis Court
Construction Lump Sum
2. Tennis Court Surface(100%
Acrylic Color System) Lump Sum
MOCK, ROOS 6 SEARCY, INC.
CONSUL'PING ENGINEERS
BF-1
s 40 8S. --
$ 36I?.—
Continued...
7A-65
(REVISED AS PER ADDENDUM NO, II)
Item Unit
No. Item Quantity Unit Price Amount
3. Tennis Court Lighting (includes
all electrical work and trench-
ing and backfill for conduit): $ 8 19 S. —
4. Fencing work complete $ 3 3 K -
Lump Sum
Lump Sum
RECREATIONAL FACILITIES ADJACENT TO ANCHORAGE PARK:
5. Site Preparation -and Earthwork
and Tennis - Paddletennis Court
Construction
6. Raoketball s Handball Court
Construction -.with footings
and oonarete slab earthwork
(excavation, baakfilling and
compaction)
7. Tennis and Paddletennie sur-
facgs.(100% Acrylic Color System)
8. Fencing work complete
Lamp Sum
$
Lump Sum $ ., o t 89 y. —
Lump Sum $ 7 /o .
Lump Sum $
NOTEt Owner reserves right to award the above Items of Work to
one or more Contractors. If only one Contract is awarded
by Owner for all the above Items of Work, Bidder shall do
all the Work for the Lump Sum amount of $ Sy i 377.
(include costs savings, if any, to Owner over above prices
for one Contract being awarded to one Contractor for entire
project).
BIDDERS MAY BID ALL OR ANY PORTION OF THE ABOVE WORK
Continued...
MOCK, ROOS 6 SEARCY, INC.
CONSULTING ENGINEERS
BF-2
7,5-65
The Bidder, if awarded the Contract, agrees to start the Work within
to calendar days after the Proceed date the Owner designates
in the written Notice to Proceed and guarantees completion of the
Project within 70 calendar days after the designated Proceed
date set by the Owner.
Bidder further agrees to pay as liquidated damages, the sum of$50.00
for each consecutive calendar day thereafter as provided in paragraph
3 of the SUPPLEMENTARY CONDITIONS Section.
If Owner's Notice of Award of this bid is mailed, telegraphed, or
delivered to the Bidder within 8ixxy (60) days after the
date of opening of Bids, or at any time thereafter before the Bid
is withdrawn, the Bidder agrees that he shall execute and deliver a
Contract in the form attached as required by the Contract Documents,
in accordance with the Bid as accepted, and that he shall furnish
the required Contract Security within fifteen (15) days of the
Notice of Award.
The Bidder further declares that he understands that the Owner may
elect to construct only a portion of the Work covered by these
Documents and agrees that he shall perform that portion of the Work
for which he is awarded a Contract at the prices quoted herein.
Enclosed is Bid security required in the sum of Two Tit M.JD scytt
iiUNpRt0 NOV retN Ocu.a i Awn 9s�(a9 ($ 2 9l?. 9S� )
which shall become the property of the Owner in the event the Agree-
ment and Bond are not executed within the time above set forth, as
liquidated damages for the delay and additional expense to the Owner
caused thereby.
Bidder acknowledges receipt of the following addenda (enter numbers):
T) O,
Notice of Award should be mailed, telegraphed or delivered to the
undersigned at the Bidder's Business Addfess noted by the Bidder at
the end of this document.
Continued...
MOCK, ROOS & SEARCY, INC.
CONSULTING ENGINEERS
BP-3
75-65
The submission of this Bid constitutes an incontrovertible representa-
tion by the Bidder that he has complied with every requirement of
Article 3 of the INSTRUCTIONS TO BIDDERS.
The Bidder hereto has executed this Bid the day and year first above
written.
If Bid is by a Corporation:
State of Incorporation
FLoRbA
S I , ,•o
(SEAL) +
,°
ATTST:
.4
retary+/ or
.0<Gl/ 2
t. Sec.)
By:
1(4C. I..
(Signature)
'Carl c . I4 W c € . ei cs i ort.11—
(Typed or Printed Name & Title)
Slm(+o ctei'oRAT: ion) ass/ RoyAt &ion 1.4.)970
PALM BeAcI{ . Pco4tt4 3svpo
(Business Address & Zip -Code)
NOTE: See Article 6 of the INSTRUCTIONS • TO BIDDERS for instructions
regarding the proper execution of this form.
MOCK, ROOS & SEARCY, INC.
CONSULTING ENGINEERS
BF-4