Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
C_Landscape Plan_North Lot Future Maintenance Facility_LP1-3
EXISTING,ADJACENT TREE LOCATION MAP CANOPIES OVERHANGING 6.0'F.P.L.AND SOUTHERN BELL U.E. UCI�GI'1 PERIMETER LANDSCAPE AREA ANCHOR POWER POLE,TYP. (O.R.B.652,PG.27) design CONCRETE WALL AND COLUMNS—,,,,,, POWER POLE S89°49'50"E 420' - kildC]LJ HRIN PIP R WN 7-9ZOHP ❑ P 24 — — — — — — AR EXISTING RED-TIP CS STUDIOS% 1 CS EXIST INGINVASIVE CS EXISTING RED-TIP CS COCOPLUM HEDGE 3 Urban Planning&Design TREE TO BE REMOVED 3 TO REMAIN EXISTING INVASIVE 3 3 COCOPLUM HEDGE Landscape Architecture MULTI-TRUNKTRI TO REMAIN EXISTINGSABALPALM CONIC.POLE Communication Gra hits BE REMOVED EXISTING LARGE H 11 TO REMAIN pGUMBO LIMBO TREE 10 ARW ?R TO REMAIN— 1 x 610 Wst Palmtis Street,Suite Beach,FL 33401UO2 CHAIN LINK FENCEEXISTING INVASIVE AROUND CONIC. EXISTING 561.366.1100 FAX 561.366.1111 MULTI-TRUNKTREETO DUMPSTER PAD CONIC.WALLwww.u00035ios.cem O BE REMOVED H #LCC0003543 Cnpydght All ideas,desgns,anangerr ,and plans RED-TIP COCOPLUM HEDGE _ PARCEL12 AR t rrpmprmdmeaag.,,r,l-�e�imEXISTING,ADJACENT r 1 EXISTING,ADJACENTprnkrft.dY u es9TREE CANOPIES m TREE CANOPIES These ideas,d"gm°ariangeeCmenls fiodl«plans OVERHANGING m a U) OVERHANGING shdlnotbeusetl by,°rdisdose .enyl,c—, PERIMETER 11 © m _D O PERIMETER fimi,°rmm°rafi° thuutmewntlen LANDSCAPE AREA C O J LANDSCAPE AREA peimissi°noffhedesigner. 2 _� CT O EXISTING SABAL PALM TO REMAIN ASPHALT PARCEL 5 ASPHALT I GRAVEL AND N GRASS LOT 00 O SP m m PLANT SCHEDULE 2 r TREES /��r CODE QTY BOTANICAL NAME/COMMON NAME /1 EXISTING RED-TIP COCOPLUM AR 6 Ace r mbrum/Red Maple HEDGE TO REMAIN AR Container Grown,Min.15'Ht.x 5'Spr.Min.5'CT 1 0 CS 12 Conarpus erectus sericeus/Silver Button Wood AR Contaociner Grown,Min.15'Ht.x 5'Spr.,Min.5'CT 1 — _ _ W PALM TREES CODE QTY BOTANICAL NAME/COMMON NAME LL W✓ SP 2 Sabal palmetto/Sabal Palm 25.0' Varying heights,Min.8'GW and 15'HL,14"Cal., �IP r R I R II ��3 Slick Tmnk 50.0'X 420'SEACOAST �/�,`O`I D� D,`- (O.R.B.19575,PG.1847) I„I ACCESS EASEMENT SHRUBS CODE QTY BOTANICAL NAME/COMMON NAME —WATER 8 SEWER EASEMENT �I (O.R.B.19575,PG.1853) — O CHR2 77 Chrysobalanus icaco'Red Tip'/Red Tip Cocop lum O (O.R.B.26061,PG.123) Iryul 7 Gal.,24"Ht.x 24"Spr.,30"O.C.,Full to base and dense O & 25.0' S a @ W w w w �11111 FR w REQUIRED PERIMETER LANDSCAPING 7T N � I m REQUIRED BUFFER TREES S 9 WESTERN BUFFERTU) REQUIRED TREES(175 LF/75'O.C. 3 TREES PROVIDED TREES 3TREES A\ ¢ NORTHERN BUFFER rm REQUIRED TREES(420 LF/75'O.C.) 6 TREES L PROREES 6 TREES Q NORTH LOT/FUTURE MAINTENANCE FACILITY-LANDSCAPE PLAN VIDED T EASTERN BUFFER TR REQUIRED TREES(175 LF/75'O.C. 3 TREES LL' 2i SCALE: 1"=20' PROVIDED TREES 3TREES SOUTHERN BUFFER S CAROLINDA DR.(ABANDONED ROW) (� a m a `a NORTH LOT/ FUTURE W J Q MAINT.FACILITY ca s a v at rn -- — ---- _ \ S p o c Z z J o II II 'a -------- ~L - 0 8 \ 6 o� THE BENJAMIN SCHOOL � \ it e ♦ NORTH �I \ 0 10' 20' 40' g s OD o I� Scale: V=20'-0" o I _—_ -----_--_— — —— -- — — Date: 06-07-2017 Project No.: 05-017.003 _ f Designed By: T ❑ _ Drawn By: TLM ELI o I) Checked By: JB u Revision Dates: -- II QO . NORTH LP-1 NORTH LOT/FUTURE MAINTENANCE FACILITY-LOCATION MAP Of 3 SCALE:N.T.S. NOES: TREES SHALL BE PLANTED INA NOTES11. LL SHRUBS SHALL MEET FLORIDA#1 GRADE OR ROOT BARRIER TO BE PROVIDED Br DEEP ROOT, urlmn 1. ALL TREES SHALL MEET FLORIDA#1 OR BETTER VERTICAL POSITION AND STANDARDS. ORIENTED APPEARO GIVE N E.DO BETTER STANDARDS. SPECIFIED AS PANEL TYPE I UB36-2 OR APPROVED EE IS 2. REMOVE ALL NON-ORGANIC BINDING AND SHIPPING POSSIBLE APPEARANCE.DO 2. REMOVE ALL NON-ORGANIC BINDING AND ROOT BARRIER TO BE PROVIDED WHEN A LIVE OAK TREE IS MATERIAL FROM THE TREE AND ROOT BALL. NOTCUTOUT TERMINAL BETWEEN 10-15'FROM SEACOAST UTILITY LINES. 3. ANY PRUNING SHALL BE COMPLETED AT THE DIRECTION OF LEADER SELECTIVELY PRUNE SHIPPING MATERIAL FROM THE SHRUB AND THE design OWNER OR LANDSCAPE ARCHITECT. TREE CROWN ROOT BALL. kildC]LJ 4. NO NAILS SHALL BE DRIVEN INTO TREE AND TRUNK SHALL BE 3. ANY PRUNING SHALL BE COMPLETED AT THE UB 36-2/UB 46-2$pCCi(iCOfi00S FREE OF ANY MAJOR SCARS. USE A PLUM LINE TO ASSURE DIRECTION OF THE OWNER OR LANDSCAPE 36" 4 DeepRoof Tree Root Barrier 5. ADD FERTILIZER AS DIRECTED IN WRITTEN SPECIFICATIONS. THE TREE IS PROPERLY ARCHITECT. PLANTED UPRIGHT BEFORE 4. ADD FERTILIZER AS DIRECTED IN WRITTEN SHRUBS SHALL BE PLANTED INA as a° °n° D I O BACKFILLING AND TAMPING. SPECIFICATIONS. VERTICAL POSITION AND ORIENTED TO m r..•a,z,ams m)��ma�i.a°'°°� PLASTIC HOSE OR(2)PLY 3/4"RUBBER TREE CALIPER SHALL BE GIVE THE BEST POSSIBLE APPEARANCE m°.mna iwar ,avwrxre a�,.nh e.`.m. �1®fes) 1 TUBE TO PROTECT TRUNK FROM GUY .un°mm,m.m '° Urban Planning&Design MEASURED 6"ABOVE GRADE FOR °e'j'z.0 m7 WIRE. TOP OF ROOT BALL SHALL SIT r:W"°" LandscapeArchitecture TREES UP TO 4"IN CALIPER AND �^°° 1"ABOVE THE FINISHED GRADE. TOP OF ROOT BALL SHALL IT MEASURED 12"ABOVE GRADE MULCH TO MINIMUM DEPTH OF 3"AFTER mau mm�n°°e,°.mu Communication Graphics (ALLOW FOR SETTLING) 2"ABOVE THE FINISHED GRADE. FOR TREES OVER 4"IN CALIPER. SETTLING.MULCH SHOULD NOT BE IN e.:e p,",-I.ie-z ALLOW FOR SETTLING ROOT BALLS GREATER THAN 2'IN DIRECT CONTACT WITH THE SHRUB BASE. - ma°"tl 4°gv"°" 610 Clematis Street,Suite CU02 ( ) #12 GALVANIZED STEEL GUY ,,ei of sl�.n,smm r. DIAMETER SHALL SIT ON A MOUND (SEE WRITTEN SPECIFICATIONS) u° Isoo"se.rsseL, West Palm Beach,FL 33401 WIRE WITH TURNBUCKLE AND � re°m.Tl.1°m — -, CONSPICUOUS COLOR SAFETY OF UNDISTURBED SOIL TO PREVENT om,(z oamm 561.366.1100 FAX 561.366.1111 MULCH TO MINIMUM DEPTH OF 3"AFTER SETTLING.ROOT BALLS SMALLER CREATE A4"HIGH CIRCULAR " t`° )"'"`""• ms a a —clkstudios.com SETTLING.MULCH SHOULD NOT BE IN FLAGS. iec N9av�arw'(+zz omj axx r THAN Z IN DIAMETER MAY SIT ON WATERING BASIN AROUND THE nm.wMrM�.m x'.u,q #LCC000035 DIRECT CONTACT WITH THE TRUNK. CREATE A 6"HIGH CIRCULAR COMPACTED EARTH. SHRUB BASE AT LEAST AS WIDE nou ros (SEE WRITTEN SPECIFICATIONS) III �°,m Copyright WATERING BASIN AROUND THE AS THE ROOT BALL IN DIAMETER. xavw w,vai vva p�,ea„N All ideas,des ms,antl TREE BASE AT LEAST AS WIDE AS SHRUB PLANTING PIT TO BE FULLY (z.axm,p mm.W yth anangeg a pans ROOT BALLS GREATER THAN T IN EXCAVATED AND BACKFILLED m�ie�(Mzi mmI m ea r,°m,oma, mpresentetl by this drawing are owner)by antl THE ROOT BALL IN DIAMETER. FINISHED GRADE ..vam c•(+szx mm) n. the,N NS ty°Ltlre tlesigner,aril wer prgedt DIAMETER SHALL SIT ON A MOUND OF WITH TOPSOIL.TAMP FILL AS ITIS z e UNDISTURBED SOIL TO PREVENT # 2”x 4"x 24"GUY WIRE STAKE ADDED.WHEN HOLE IS 2/3 FILLED, ,me uta „ a tar the exclusive useollhe speCiFetl prgecl. mne ry°mm wmx'i�g r These itleas,tlesigm,armngemenls ar pMns aaemey W°rm,g m°vmei nm°n°u,er. SETTLING.ROOT BALLS SMALLER MADE OF PRESSURE TREATED WATER THOROUGHLY,RELEASE _ hall not be usetl by,ardistlosetl to arty person, THAN 2'IN DIAMETER MAY SIT ON HARDWOOD ANY AIR POCKETS,THEN — TIN mxa vmwAm.a m.aAma°'°"°"°. firm,°rcaporah.n W a,_me wr a. COMPACTED EARTH. FINISHED GRADE COMPLETE FILLING.TAMP AND xxmai am mm.. wmawm,m varu°mne permission oltlre designer. DIAMETER OF EXCAVATED HOLE SHALL VIII _III WATER THOROUGHLY AGAIN. .w.°s BEAT LEAST TWICE THE WIDTH OF THE TREE PLANTING PIT TO BE FULLY (SEE WRITTEN SPECIFICATIONS) DIAMETER OF EXCAVATED HOLE SHALL ,ax x�e wx Ana m vxWx Mneum Wm o.w,u xa w mw-z ORIGINAL ROOT BALL OR CONTAINER. —III EXCAVATED AND BACKFILLED BE AT LEAST TWICE THE WIDTH OF THEeme,.a,z .,n. (SEE WRITTEN SPECIFICATIONS) = WITH TOPSOIL.TAMP FILL AS IT IS ORIGINAL ROOT BALL OR CONTAINER. y.m'ax x-z. 3)a ADDED.WHEN HOLE IS 2/3 FILLED, (SEE WRITTEN SPECIFICATIONS) �x vw nirs v,A r*xu.�mi,m.e,.1d WATER THOROUGHLY,RELEASE 1 X s,•�:m. �o ry ,m•r r ,,,• 1 �a= t+ ANY AIR POCKETS,THEN ZX COMPLETE FILLING.TAMP AND ZX WATER THOROUGHLY AGAIN. `x' •� TREE PLANTING DETAIL (SEE WRITTEN SPECIFICATIONS) n LARGE SHRUB PLANTING DETAIL NOT TO SCALE NOT TO SCALE a2x a,am u.,aa mu. oaa�m mm,a 1 NOT1. ES: z rw..naa am v+vaaua.mau ar,rmm m rx.ea..W s-rz aeM1aavux,m e i. 1.//��� 1. ALL TREES SHALL MEET W FLORIDA#1 OR BETTER ROOT BARRIER DETAILS STANDARDS 2. REMOVE ALL PLASTIC HOSE OR(2)PLY 3/4"RUBBER PLAN SYMBOL N.T.S. NON-ORGANIC BINDING TUBE TO PROTECT TRUNK FROM GUY AND SHIPPING MATERIAL WIRE. N.T.S. `V FROM THE TREE AND ROOT �� TOP OF ROOT BALL SHALL SIT O BALL. ®� �j,,@@,, / 2"ABOVE THE FINISHED GRADE. 3. ANY PRUNING SHALL BEmT'" "� (ALLOW FOR SETTLING) COMPLETEDATTHE O DIRECTION OF THE ��0�;® #12 GALVANIZED STEEL GUY WIRE WITH }' OWNER OR LANDSCAPE �/ "6 O TURNBUCKLE AND CONSPICUOUSLY S ARCHITECT. 6tf ® .6.�{j COLORED SAFETY FLAGS. 4. NO NAILS SHALL BE DRIVEN ® d' ® �® •/R INTO ®� TREE AND TRUNK O . ® ® ROOT BALLS GREATER THAN Z IN NOTES: SHALL BE FREE OF ANY DIAMETER SHALL SIT ON A MOUND OF r 8 d O UNDISTURBED SOIL TO PREVENT 1. MULCH RINGS SHALL BE SOD 7 q MAJOR SCARS. PROVIDED FOR ALL 5. ADD FERTILIZER AS ®O SETTLING.ROOT BALLS SMALLER THAN tQ 2'IN DIAMETER MAY SIT ON TREES AND PALMS MULCH RING SHALL BE CUT INTO A'PERFECT S DIRECTED IN WRITTEN PLANTED IN SODDED CIRCLE'. N SPECIFICATIONS. COMPACTED EARTH. AREAS OR AS EDGES TO BE WELL-FORMED AND CRISP WITH euwiEaL CREATE A 6"HIGH CIRCULAR WATERING OTHERWISE NOTED ON VERTICALLY STRAIGHT CUTS. (sEE xorEs eELoxi Q MULCH TO MINIMUM DEPTH OF BASIN AROUND THE TREE BASE AT LEAST LANDSCAPE PLAN. MULCH RING SHALL MEASURE 5'IN DIAMETER ^ ` 3"AFTER SETTLING.MULCH AS WIDE AS THE ROOT BALL IN DIAMETER. OR EXTEND TO THE EDGE OF THE DRIP LINE, 2i SHOULD NOT BE IN DIRECT WHICHEVER IS GREATER. -- �� —111- g e —I'— eg CONTACT WITH THE TRUNK. MULCH TO MINIMUM DEPTH OF 3"AFTER SETTLING. III 1 L (SEE WRITTEN SPECIFICATIONS) FINISHED GRADE MULCH SHOULD NOT BE IN DIRECT CONTACT WITH — III III — 6 THE TRUNK.(SEE WRITTEN SPECIFICATIONS) III= 1111 2"x 4"x 24"GUY WIRE STAKE TREE PLANTING PIT TO BE FULLY 4"'" IuansaeExHasErc) MADE OF PRESSURE TREATED III III EXCAVATED AND BACKFILLED WITH SEE—E+ M XNN211 WIVd a0 33211 }I W g HARDWOOD III IIII TOPSOIL.TAMP FILL AS IT I ADDED. _ WHEN HOLE IS 2/3 FILLED,WATERrzs.(v�asc xercx ro xmrrEx samrxnrays rae,mmroxar rsouwcuExrs) O w" a DIAMETER OF EXCAVATED HOLE THOROUGHLY,RELEASE ANY AIR / MULCH RING IN SOD DETAIL +.rxre pmax�r swu ar.a axxW,x Wm r R r xxa Roar aW,xm.s aem. SHALL BE AT LEAST TWICE THE POCKETS,THEN COMPLETE FILLING. �J NOT TO SCALE z.Azz Roor aaRmERs sruu eE•wwWu,u ur m WIDTH OF THE ORIGINAL ROOT 1X TAMP AND WATER THOROUGHLY AGAIN. n�Eczm er—1 tQ BALL OR CONTAINER.(SEE (SEE WRITTEN SPECIFICATIONS) wrvc.au R°°r awxrcRs swu rxraa uv r°rWrexm c+aor. WRITTEN SPECIFICATIONS) 2X saarmxs.wren a4W.ucRs sww.eE se Reaxas.ruwzru+uxm er eroeaaRrcR. iµO moi Li N N s.ur.uoor eaaRURs szuu eE Wsrurm w ucaRo,wcr xrm uvwranuRCRs xmmcx xsraucrwra. IRREGULAR&MULTI-STEM TREE PLANTING DETAIL LAYOUT OF SHRUBS AT THE PLANTING ° S Q C NOT TO SCALE REMAINING SHRUBS ARE FILLED IN + + EDGEISDONE FIRST TO ESTABLISH A Typical Canopy Tree,Large or L p r BEHIND THE FRONT SHRUB LINE. + + CONTINUOUS LINE.BEST FACE OF SHRUB Exotic Palm Tree with Root Barrier r Z Z J o + + + TO FACE FRONT OF PLANTING BED. x,y,,,i 24,zme I—A-15) NOTES + + SOD.USE 1. ALL PALMS SHALL MEET FLORIDA#1 + + + + + SURFACE.ROLLER TO SMOOTH + GRADE STANDARDS OR BETTER USE A PLUM LINE TO ASSURE + 2. REMOVE ALL NON-ORGANIC BINDING III „„',(, PALM IS PROPERLY PLANTED + + \\� AND SHIPPING MATERIAL FROM THE V UPRIGHT BEFORE BACKFILLING MULCH RING _ PALM AND ROOT BALL. �13 IyIIIir07>allpp AND TAMPING. + 3. NO NAILS SHALL BE DRIVEN INTO NO TREE TO BE PLANTED CLOSERPALM AND TRUNK SHALL BE FREE OF THAN 4'TO BED EDGE.I,," TRUNK DIAMETER SHALL BE CONSISTENT '.'.ANY MAJOR SCARS. aWITHOUT ABRUPT CHANGES,LOOSE 4. ADD FERTILIZER AS DIRECED IN ' 1Ii�I{{ ql Ii it II�IIIy 111' SHEATHES,HOLES,OR CAVITIES. ----- - PLANTING BED EDGE CUT CLEAN AND I "gd'III ^J� STRAIGHT WRITTEN SPECIFICATIONS. I'I �IIII IIryI Il,nil VIII,P,/I 1 I SECURE BATTENS W/23/4"HIGH CARBON MAINTAIN 12"ALONG BED EDGE;SEE < III Oil�Illllil,l "•r� °"� III, STEEL BANDS TO HOLD BATTENS IN PLACE. TRIM ONLY THOSE FRONDS IIII�IIII III HEIGHT OF BATTENS SHALL BE LOCATED PLANTING BED EDGE DETAIL WHICH HANG BELOW�� I ISI ' SHRUB&GROUNDCOVER LAYOUT DETAIL PROPORTIONATELYTOTHE HEIGHTOF ` / C LEVEL OF TREE HEART (IIII I, THE PALM FOR ADEQUATE BRACING. \/ NOT TO SCALE 5 R MINIMUM 3xI 5 x 16")WOOD BATTENS. 6- WOOD BRACES LAYERS IIII1 S EEL BANDS(3/4"H.0 S.W RAP TRUNK. Dale: 0 07-2017 MULCH TO MINIMUM DEPTH Project No.: 05-017.003 OF 3"AFTER SETTLING. r eAxmm MULCH SHOULD NOT BE IN TOP OF ROOT BALL SHALL SIT BEST"FACE"OF PLANT TO BE (SEE xoTEs aELox7 Designetl By: TLM DIRECT CONTACT WITH THE _ 2"ABOVE THE FINISHED GRADE. TOWARD THE FRONT EDGE OF Drawn By: TLM TRUNK.(SEE WRITTEN _ (ALLOW FOR SETTLING) THE PLANTING BED. _ — I=— Checked By: JB SPECIFICATIONS) MULCH TO MINIMUM DEPTH OF 3" = IIII —� $b CREATE A 6"HIGH CIRCULAR -III III-Illi R" Revision Dates: 2"x 4"x 24"STAKE MADE WATERING BASIN AROUND THE AFTER SETTLING OF PRESSURE TREATED PALM BASE AT LEAST AS WIDE AS 12"WIDTH ALONG BED EDGE - — — — HARDWOOD THE ROOT BALL IN DIAMETER. FOR MAINTENANCE I" -111- war tnrs FINISHED PALM PLANTING PIT TO BE FULLY (MAINS,sEmncEs ETC.) GRADE EXCAVATED AND BACKFILLED SHALLOW SAUCER AROUND PLANTING BED DIAMETER OF EXCAVATED _ _ — WITHTOPSOIL.TAMP FLEAS ITIS rmrzs m�rnsE RErrx ro xanw saccnarro"s rux anvnwxa.Rc°uwcwcxrs) HOLE SHALL BE AT LEAST III ADDED.WHEN HOLE IS 2/3 FILLED, r srvnr ec v u,xwuu xnx Raor sxRrcR uro ro wuuux a xo—aN—-— TWICE THE WIDTH OF THE WATER THOROUGHLY,RELEASE .ur r ar xxmM° ORIGINAL ROOT BALL OR ANY AIR POCKETS,THEN ///////1�11/l//\//I III III III ///////// ,xsvccrEo°v sucoAsr CONTAINER.(SEE WRITTEN V COMPLETE FILLING.TAMP AND f III 1 _ vRroR ro eacxrnawc.au rs°or savnreRs swu.rxmro w ro arv,sxm caaoE. SPECIFICATIONS - WATER THOROUGHLY AGAIN. I� or.wo-rsaor 1x III EXISTING SOIL sozurroxs.r+rxarc aWRreRs swu°c se vawr�s MwuanuRm°r e,oewRrER. ZX (SEE WRITTEN SPECIFICATIONS) III I I I I I I I I I I I I I I I x ur Rmr a4 xu xar wM ss xa�R avRaovfo m Wrs�n�uxERs�wxmEx xmRuc+roxs. 0 PALM PLANTING DETAIL n PLANTING BED EDGE DETAIL �rERTypical Shrub,Small Tree or LP-2 NOT TO SCALE NOT TO SCALE Palm ATree with Root Barrier of 3 SECTION 02950 TREES SHRUBS AND GROUND COVER 2.02 SOIL AMENDMENTS AND FERTILIZERS D. For planting betls,mix planting soil either prima to planting or appy on surface of topsoil and Landscape Architect Only clean,sharp tools designed for Lh.purpose shall be-ad The 4.02 WARRANTY PERIOD A_ Peat Moss_Peat moss shall be a commercial,baled sphagnum material,free of woody mix thoroughly before planting_ goal of pmning is always to preserve.old enhance the natural charade,of the plant Pmning A. Unless a different agreement is,..chert in writing between the Owner antl the Contractor,all �� PART I-GENERAL material,minerals,or foreign maft,,,with a pH range of 3 0-5 5. shall be tlone per mortem haNcuflual practice(see National Arborist Standards,latest trees antl other plant material,inclutling ground covers,installetl untler this agreement shall By bidding on this peaj.cl antl/or signing a centrad for n rd-pe work,the Contractor B. S tl_Sandi shall be clean sharp,antl free of all d.let....s material 1. Mix n..dh dry s-I p- t -..g f f d l r atlition)_ be guaranteed to live and grow,antl shall be wmranl.cl raga cost tl,f.cts,deem and acknowledges that he/she has heart and understootl these specifcations-n their,ntrety,that C_ Lm.:Natural limestone(Gobm 1,)centain ng not less than 85%of total cmbnnat,s,ground 2 Prevent lime from contacting roots of acdi-loving plants_ B. Pruning shall be limited to the ai ...necessary to remove imjuadi twigs,branches,antl ,satisfactory growl],for a penotl of ane(1)year from the tlay of final acceptance of contract he/she has inspected the site,antl that he/she antl and.by all plans,specifications,and contlitions so that not less than 90%passes a 10-mesh sieve antl not less than 50%passes a 100m.sh bonds,to compensate for root loss suffered tluring d itki ng antl transplanting,antl to thin antl work. found here_ A y p -m-rd is or cencems wfhim the specfications or on the plant list, E_ Unless drawings ind cat.otherwise berms shall not,xce.tl a 3.1 slope_Berms near builtlings shape shmbs antl[roes_ In no case shall more than 1/3 of the bmmc,ng s m no be B_ Non-living landscape elements shall also cavy a one(1)year guarantee on materials labor, I -mduding m labii ty of mater als,are to be brought to the all,nton of the Landscape Aach t,ct D. H s So I Coad tiro _C sing of yard trmm rigs antl th-olds co- rnium,L r in Potentially troublesome tlranage s tuafons shall be checked for conect d ou..ge by the convert_Damaged scarred frayed spl t or sk nned b,gs,branches or limbs shall be antl workmanship_ poor to bitl submission E. F rffizer Fertilizer shall be a commerc al gratle,granular,slow mi..-'pm. l.nl type project Eng neer or Owner prior to planing_ Pmnetl beck to the next sound outs de lateral hurt,branch or limb_The term nal b,d or leader C_ Material found to be tlead or in Poor ce d tin ;thin the Warranty Period shall be replaced by f,til z.r F_ Tree antl shmb planing betls which fall wfhim or near parking lot areas shall be completely shall never be aee-od the Contractor vi thin fifteen(15)tlays f llem ra,bficafion by the Owners representative_ 1.01 WORK INCLUDED 1. Fertilizer shall be d.liv„ad to the site in the original p..r.etl container,bearing the caval.d and back-filletl with topsoil.All shell-rock or other base materials,and all subsoil C. Prone trees antl shmbs to retain requiretl height antl spamarl Remove the minimal amount of The Owner or Landscape Archfecl shall be the sole judges as to the contlition of the material_ A_ Cmnbucta shall obtain or ensure that all necessary permits have been granletl to the Owner nufactureYs guaranleetl analysis.Any apenetl,ceketl,or tlamagetl fertilizer will be antl tlebns,shall be completely removetl from beneath such planting areas,to a minimum wootl necessary on flowering trees antl shmbs_ Remove only tlead or dying fronds from D_ Materials antl labor involvetl in the replacing of materials shall be supplied by the Contractor I�u I da fur work on the Ownees properties or in any atljacent easements prior to cemmencemenl of rejectetl_ depth of 24". palms Culs over 3/4'in diameter shall be trealetl with tree wountl paint,all exposetl living at n.additional cast to the Owner S T U D I O S� work. 2. Tree, palm, shrub and grass f.rtilo.r shall be "UF (University of G_ All tree antl/or shmb planting areas within 36'of builtling foun latrans,and any other planting tissue shall be cev.retl_ E Soil Testing_Should plant materials show yellowing or other signs of soil antl/or nutritional B_ All planting and construction work shall be ex,culed as shown on the provlded tlrawings, Florida)Formulated"product 8-2 12 or 8 213 with ai nor elements as an all-purpose s where s gnificant buried constre ti dobris is encountered,shall be excavated to a D_ EsAing Trees_If-fi tart on dice-gs,Contractor shall pmne antl th r erst ng trees on site_ problems,the Owner or L-c-pe Architect may request soil testing antl analysis_ Such Urban Plannin &Desi n schedules,and specifications_ fens,or equal,antl appl ed accord ng to the manufacturers d rector m tlepth of 24 antl b.d,filletl with topsoil as spec fietl elsewhere n these The use of dim,ng spurs is n ehibfetl_ All diseased,tleatl branches antl those nleafenng testing will be at the expense of the Contractor. g g C_ Any michbonal work or materials required to install landscape elements as called for on the 3. Application of fedilrz.r shall be consistent with the current recommendations of the Green sp.oficafions. with healthy plant growth shall be removetl.Also,remove mol suckers,low branches,antl any 1. Soil prabl.ms(as re haled by testing)shall be conected by application of corrective Landscape Architecture plans,specifications or plant list shall be p-ded antl installetl by the Contractor Ind--hes-Best Management Practices. others as tlirectetl by the Owner a Lam-ta,Archmd_Cuts shall be flush with the trunk or chemicals and nutrients,removal antl replacement of soil,or other measures as agreed Com m un i cation Graphics D. Finish Grad,Elevations 2 inch below top of pathway rA ging_ 4 Fertilizer shall be appli,di by an intlivitlual who has successfully cempletetl the GI-BMP 3.03 TILLING limb and shall be a...te t with tree Paint Remove any nails,wires,etc_fast...d to the free_ upon by all Parties All such measures shall b.at the Contractors expense unless clear E The Contractor shall be entirely responsible for.II work until final acceptance by the Owner program antl holds a current Urban Fertilizer License or as requiretl by the Stale antl A_ Before mixing,clean soil of roofs,plants,clay lumps,shores in excess of 1"in tliameter,antl -,done.establishes that the soil problem is not In--sting antl is caused by factors 610 Clematis Street,Suite CU02 The Contractor shall protect all materials antl wort,ag- t injury antl shall proad.and Local Ordiinaues other extraneous or Potentially hamdul mater als_ 3.09 PLANTERS-DECORATIVE OR STRUCTURAL beyond the Contractoes control_ West Palm Beach,FL 33401 ainta r all necessary gu.,ds for the protection of the In bl_He shall be held respons bl.far B. After all so=d onng(antl topsoil f called far on plans)has been spread at sl.�,di rates, A. If sl.dh,di,landscaping in planters shall be installetl using the following.other F Replacement antl Conditions_ 561.366.1100 FAX 561.366.1111 any negligence during the execution of the work_ 2.09 WATER the areas to be plantetl should be thoroughly rotary-tilled to a depth of six(6)inches Plowing 1. Materials will be roplaced as many times as necessary to satisly the OWNER'S A_ All water necessary for planting antl maintenance shall be of satisfactory quality to sustain or dicing is not an acceptable substitute for miary4diirg. 1. Install 4"tleep layer of fine crushed stone in bottom of planter representative and the spermcations_All replacement costs will be the responsibility of -.udkstudios.cam 1.02 QUALITY ASSURANCE atlequale growl,of plants antl shall not contain harmful,natural or manm.d.elements 2. Install filter fabric over stone layer Tum up areas of fabric all arountl_ the Contractor. #LCC000035 A_ All wod,specifietl herein shall be P,rform,di by a single firm sp...lizing in I.rA scop,work. detrimental to plants. 1. ft the sprinkler system is installetl after grading and tilling is completed,the backfill shall 3. Install planting soil mix over fiber fabric to within 3%"of top for planter Do act canpact 2. Replacements will be of the same size,species,antl spedficafions as the original No The Lamscap.Architect antl the Ovm„retain the right to approve any proposed be refilled n the.gecmrJ areas_ planting sol_ arcldon.l so aclditv.s will be requiretl unless significant.mounds of soil mix are lost Copyright subcontractors poor to aw,e ng the conme,L 2.040THER LANDSCAPE PRODUCTS 2. When the subsoil,grating,topsoil addition,soil cenlditianimg,antl tilling have been 4. Install plant material as sp.misd.Isewh.rein these specificstions_ before or duong replacement Allidieas,designs,artan9erreds antl plan¢ B_ Ship l.nd-W materials with ceddicams of inspection requiretl by gov.mimg authorities_ A_ Mulch_Mulch shall be shreddetl Melaleuce,Eucalyptus,Grade"A"Pine Bark Nuggets,or ce.phshad,.II areas so treated shall be compacted antl settled by.ppluation of 5. Install 3"of mulch over planting soil_ 3 Plant losses due to.bnormal weather conlifions such as Floods,excessive wind tlamage ft pm dy by tli sdavnng aa!wn.dby antl Comply wit,all regulations applicable to landscape materials. approv,tl equal,flee of foreign materials antl weed seeds_Minimum tlepth after settling shall heavy irigafion to.mmimum tlepth of tw.h,(12)inches Erosion scars shall be (on pro d taked or ed trees,severe freezin hail will not be the as bili �Pe,.dy of die tleof ft and were a..t.tl pegs guy ) g,or pons; ty fatlre.s..deuse,.-np.cihedi u,plau C_ Package by recatlproductswithmanufacturerscerml-anaysis Forother materials,provide bey"_ repairetl_ A SODDINGNEW LAWNS ofthe C.s nnat- These it las,sed by,arangsed!to ny Pers nalysis by recognized laboratory roadie in ceaNance with melhatls esfablishetl by the B. Guying antl Bradng_Tree guying and baring shall be the responsibility of the Contractor in A. The Contractor shall sort all areas indicaletl antl notetl on the tlmwings_ No sotltling shall 4. Dedtluous materials will be guaranleetl to bask tlormancy at the proper se _ shall not be usetl by,ordisdmsetl to arty persm, Assodafion of Oflidal Agricultural Chemists,wherever applicable_ ccomamce with the planting details to imsoa stability and maintain plants in an upright 3.04 FINE FINISH GRADING until areas to be sodded...Geared of any rough gress,w.ms antl dobns,the ground Materials planted tluring their n rmal dormant Pened antl be guaranteed fo resume fico,orcaporation without the whiten D. Provitle foes,palms,shmbs antl g.undcov.r grown in a,.ceen-cl nuns.ry in merml-c. position A. When preliminary grading has been count,ch t antl the soil has dead su0icienty to be a.dily brought to a en gad.and sp.�,di amendments have been addetl_ See details for normal growth at the proper time for that species_ permission of the designer. with good horticultural practice_ Materials must be healthy antl vigorous,ftee of tlisease, C_ Amtitlesu,ant A bAm,icc.nl shall be'Wlltpru"o„qual,f specified on plans. worked,all lawn antl planfing a s shall be gu letl to the elevations indicated on the spoon....ndar-ts as par sort type_ sects,eggs,larvae,antl defects such as decay,rot,knots,sun scald,injuries,abrasions, D. Tree Wound Paint:Tree w mal paint shall be a asphalb.base paint containing an Engineering Plans_The lop four(4)nch,s shall be completely fie,of stones larger than one B. Whenever a suitable area has been correc and is ready for socldiing the Contractor shall, LANDSCAPE NOTES antl Poor or unusual forth No callecletl an d...I antl be p.rmitt.tl unless specific written antibacterial agent,specially preparetl for tree surgery work. (1)inch_ Gratles not otherwise indiicet,di shall be umform levels or slopes between Points when diactetl by the L.ndscape Architect,Proceed at once widh the-dd,.g of the available GENERAL approval is gmntm E Super Absorbent Polymer 7.rm Sorb"or app-d equal as Packagod in 3- Hantly Pac where elevations are given Positive dunnage away from buildings shall always be maimanuAl s_Soddimg shall be inceryoatetl into the project al the earliest practical time in the life of 1_ All proposed material shall be Florida No_1 or better.s set bath in"Grad-&Standard! for E Do not make subsW.ho s_If sp.cifi.di landscape an d...I-s not available at time of planting, composed of synthetic.criam de copolymer,pot.ss um,acrylate_Pa fid.size of 1 0 mm to Surface tlrainage shall be tl iacletl as indicated on the d=ngs by remodel ng surfaces to the contract_No sod which has been cut far more than seventy two(72)hours shall be usetl Nursery Plants;Part 1&2,Head.Dept of M.-Itme antl Consumer Services,latest ad ition. submit proof of no.avail.bility and p,mid.a Is1 of Proposetl.quvalrnt material_Once 3Fmm.nd absorption ml.of 30U t.,s its weghtn water,if sp,cfietl on plans facIbd.th,maturalrumoftofwat,,.All depressions where waterwill stand,all v Ald,erosion, unless specifically author,od bythe Landscape Architect or Owner after lis careful imsp-ban No tleaations will be permitted_ authonzatl adjustments to the contract w II be made_Owner-s not fine...11y responsible for s.m trenches antl excavations,and all mines and rises shall be amended and/or removetl thereof Any sort which is not plantetl w thin twenty four(24)hours after cutting shall be 2 By-tho tt cup a ti d,the landscape contracte,-s responsible for pmvlding the an d...I author zed substitutions Apply tlry,using the follawimg.mounts: leaving a smooth,even fin sh gratle.ft additan.l amended topsoil is,egor.d to accomplish stacked in an approved manner and ne mita ural property mo h n al sp.miod on the plans_ No substitutions will be acceptetl without prior written approval and }_' F Plantm.t.ands of larger s-than specifietl may be used f acceptable to Lampe Anmifa,t 1_ Fortrees.ndpalmsupto36"tliameterraotball,-.one3- H.ndy P.c. the;mentofthissperi�.ation,ilsh.Ilbeaccording to the foregoing specifications fortopsoil C_ The sort shall be placed onthe prepared surt.ce,with etlges in dos.confact,,ad shall be cceptarm by the Owner or his apasentathm,or Landscape Architect. antl f sizes of roof balls are increasetl proportionately_ Installation of larger sizes will not 2. For trees antl palms over 36"tliameter root ball use two 3 oz firmly and smoothly embetldetl by light Tamping with appropriate tools Sotl shall be,riled 3. Materials to be hand elected at the discrabon of the Owner or his apasrntab-,or contract amount unless specifically aulhariz.d by Own., 3. Handy Pacs_ Broadcast throughout planting hole antl backfill.s per manufacturers 1. All area shall be gadetl so that the final unarm,are 2"below atljacent pav,tl...s, with 1 000 lbs_roller unless war,od by the Landscape Amhitect or Owner. Landscape Architect G_ Ovmer antl Land_ Architect reserve the right to inspect,approve or reject al any time sp.mications_ sidewalks,valve boxes, mown drips,de.-ts,drains, etc_,with appmp..te D_ Whoa sotlding is used in tlrainage chtch.s,sort panels shall be set in a staggered Patt.m, 4_ All wort,shall proceed in a professional manner in accordance with standard nursery and U plant an d...Is or work a[her al the nursery or al the she which dices not meet the condition in adjushm.nfs for vary ng sort thicknesses_ The intent is for water always to drain away such as to avold bnuous seam.long the line of flow_Offsets of ntl Ad.al strips shall not install t practice. /R the plans plant I st or sp,cifcetioms For container grown plants_ fin.paving nto lawn/sod areas_ d s x(6)- h _At the insd.of the curbs-d shall abut squarely and evenly. 5. Quaniti on plant list..for convert once only_L.ed-pe Contractor,responsible for all ��/ H_ The Conbucte,shall be responsible for planting the landscape in complete accerdamce with all Container Siz. Application Rale 2 Eliminating all.rasimn scars prior to beginning planfing_ E On amas where the sort may slidie,tlue to height antl slope,the Lamp.Architect or plants shown on planting plans_When discrepa...s occur b.hv,em plant list antl planting applicable codes,ortli=ms,antl laws_Any math ficabon made to-.to-with sad codes, 1 Gallon 1 Hantly Pac/9 Container` 3. The Owner antl/ar his representative shall approve.II final finish gmdes prior to planting_ Owner may direct that the sort be pegged,with pegs d-on through the sort blocks into firth plans,the plans are to.-had.the plant list in.II cases_ Contractor is responsible for U_ laws antl ordinances,after the bitl-s aw.m od,shall be cempletetl al the Contactors expense 3 Gallons 1 Hantly Pac/4 Come e s earth,at sofable intervals- confirming sort qu.ntii ntl certitying such to the Own , mpres h dive_ al uo mk tiomal cost to the Owner 7 10 Gallons 1 Hantly Pac/2 Contaners B_ Prior to fine grading or the nstall.tion of plant material the Contractor shall obt...cerMcabon F Any pieces of sort wh ch,after placing,show an appearance of redr...d rym,ss shall be 6. Contractor is respons bl for lm ad ng all urld„grountl tilt prior to d gging.Notity the 20 Gallons 1 Hantly Pac/1 Conmumr that the progect area-s at the gado levels pmposad by the C ail Eng neer or Landscape ..ov.di from the work_ Owner or h s representative,or the LarA scepe Arch tact- mediatey rag a ng discrepancies 1.09 SUBMITTALS Architect From.licensed Surveyor.The Contractor shall fine gratle the lawn antl planting G_ Where placement of new sort.bots-fling sual areas,new sod must be placed in such. o,cemflicfs. A_ Certficabon Submit certificates of inspections as requiretl by governmental,ul,onfi,s,and 2.05 PLANT MATERIAL as to bring the rough gratle up to final fimsmAl gratle allowing for thickness of sort antl/or as fo produce an even transition to existing sotldetl areas. 7. Landscape Contr.dor to notify the Owner or his mpres-b dive,or Landiscepe Architect a1 nufaclumns o ventlors certifiedi.nalysis far soil=rA rnemfs antl f.rtilo.r an d...Is_ A_ Plant list is Part of this specification section The Contactor shall be responsible for famishing mulch tlepth. H_ It shall be the responsibility of the Contractor to bring the sort.dig,in a neat,dean manner to least three(3)working tlays prior to beginning any stage of work r_ Su bmf other data substantia[ingthataatormis comply with specified requirements_ antl installing all plantand...Is shown onthe drawings antl plant list In case of conflict the edge of.Il paAng.otl shrub areas_ 8. Owneror L.nldscepe Archifedtob,im.ediial.lymobfi,tlofanydiiscr.p.ncies foumclinfi.ld. B_ Submit seed ventlors c.,thetl statement for each grass seed mixture requiretl,shading between the two doc....Ns the dmwings shall mle_ 3.05 PLANTING TREES AND PALMS 9. Ovmer or his representative,or Lantlscape Architect reserve the right to field atljusl plant botanical and common name,Percentage by weight,antl percentage of purity,germination, B. Quality:Trees,palms,shmbs,antl other plants shall be Florida#1 or better.s di,fim,di in the A. Layout intlivitlual tree locefions and areas for multiple plantings.Stake all Iocalions and outline PART IV MAINTENANCE ESTABLISHMENT AND WARRANTY PERIODS material on-site to avold conflicts or tliscrepandes not anticipaletl in the planning process. �' antl weetl sued for each grass seetl species latest etlifion of Gratles and Standards for Nursery Plants,Elrod.Department of Agriculture as,then secure Landscepe Amhfto.fs meopt.nce before the start of planfing work. 4.01 MAINTENANCE AND ESTABLISHMENT PERIOD 10. Existing plant material to be removed,except as notetl_ O r C_ Planting Schedule:Submit planting schedule showing schedule dates for each type of planting antl Consumer Services_M.Ib4mnk,di trees will not be acceptetl unless they are specifically B. Proor to preparation of tree qts,ascertain the location of all electrical cables,all conduits,all A. The Maintenance Pared shall begin i nonalu rdy after each plant is Planted,antl the /^��+ i n each area of site. spedhed in the planting plans_ All plants shall have.normal habit of growl],antl shall be utility lines,oil tanks and supply lines,so that proper precautions may be taken not to diisluab Contractor shall continuously maintain.II areas i.-hedi in this contract tluring the progress TREES&PALMS O W D. Maintenance Insbuctiors:Submit typewritten procedures Far..ud...nce of n rd-pe work, sound,healthy,antl vigorous_Trees shall have normal..11A.eloped branching structures or tlamage any existing contlitions_Property.amain and protect existing utilities_ Should of the work_ 1. All trees,.a..ad reloceted,fo be,faker]antl guyed as detailed. }� through final meoptence_ antl vigorous root systems that...not root or container bound_ such underground or ay.rh..d obstructions be encountered that interfere with panting,the B. The Establishment Period shall begin on the first day after all panting antl installation of.II 2 No double or multi-trunk trees unless oth.rvnse specified. Canlmdor will inform the L.nd-pe Architect or Owners,.presentative antl shall be lamp.elements is compleletl antl initially acceptetl_The Contractor shall continuousy 3. Face of trees antl palms to b,located a arm...of 2'-0"oft all sidi.w.lks/bil,paths or other = a ,w 1.04 DELIVERY,STORAGE AND HANDLING 1. Balled antl bualappetl plants(BB or b&b)shall be tlug with firm,refuel balls of earth,of nsultetl as to the mil-t menl of the location of plants to Gear such obstruction or the maintain.II areas fro.initial acceptance unfil final acceptance by the Own.,Th. paved surface,unless.the--relatetl on plans_ V' A_ Packaged Materials_Deliver packagetl materials in original containers showing manufacturers suflidenl depth and diameter to inclatle the fibrous antl f..tling mots_ Plants with mlocetion of the obstmction Establishment Period shall continue for not less than ninety(90)continuous-leader tlays_ 4_ Root suckers on Live Oaks a.not meopt.ble_ r guaranteed weight anaysis.ntl name of manufacturer Protect materials fiam tlamage and cracked,tlry,or broken balls will not be acceptetl,nor will plants with mol balls of C_ Tree pit locations shall be staketl by the Condmctor antl.ppr-ori by the Owner or L.ed-pe Humcan.cut Sabal Palms shall have an Eslablistan-t Parodi of not less than one huntlatl 5 All trees telling within grassetl saes fu have a mulch ring 3'in diameter,mulchetl 3"tleep r`7 ' d.to.orabon tlurng del very antl storage. i-f room size Architect before digging_Pits shall be excay.tetl to the depth antl width indiicatedi antl.II and a ghty(180)continuous calendar days_The Est.bl shment Period will.ntl at flee time the with no more than 1"tleep da.clly adjacent to the bunk of the tree. Q 9 B_ Trees,shmbs,and grountl coven_Provide freshly tlug trees,palms antl shmbs_Do not pmne 2. All plants,other than those collectetl on site,shall be nursery grown m accerdanm with miner I removed Project is given final acceptance.An-nspection shall be made by the Owner or Landscape U) 2 we = g8 prior to tlelivery_All plants shall be hearted antl stored sm that they are atlequately protected good hmirmilual pm.bms antl antler climatic conditions similar to the sit.for at least D. Protect.II areas from excessive compaction by foot traffic or machinery when bringing hoes Architect to accept the cempletetl wort,and issue a determination of substantial completion PLANTING BEDS •V e from tlryimg out,From sun or wind bum,and from any other injury at all times_Any plant two years_Tmnsplam img or mol pmning shall have taken place tluring growtti_ to the planting area_ Inspections may be performed on.II or partially co.d.tedi phased work untler the Contract, 1. Grounticever antl shmbs to be laitl out in a uniform and censisfenl pa8em. (a 8 do.,ned to be willed or burned may be r.j,ct.d al any time,whether in the grountl or moL E All excay.tetl holes shall have vertical sides with mughenetl surfaces antl shall be of a size as tlirectetl by the Owner 2. All planfing betls to receive mulch per plans_ \{/ Plants shall be handled only by their containers or root balls,not by stems or bunks Trees C_ S¢e_Plant s, ,frown.the plant list are mi,mums_When.plant size-s given by height that is at least twice the widith of the original plant container or ball_In.II cases the holes shall C. Maintenance of new plantings shall ce sist of,but cwt necessarily be limited to,Pmning, 3. Landscape Contractor is responsible for verifying that clean top so I,meeting the attachetl . L L {F that are scoped or scared tluring tlelivery,storage,or planting will be rejected The onsite antl spread or by center r sz.,all specifications are miamums to be met or.xcoadod_All be large enough to P,rmil handling antl planting without damage to the roots or mol ball_ watering,cuflivafing,weed ng,mulching,tightening or replac rg guys antl stakes,resetting specificetons,exists-n ach planting bed Prior to planting. Contractor shall add or..-Al N storage area shall be approved prior to the tlelivery of any plant materials Do not bendi or bind trees and shmbs shall be measured when their branches are n rmal position Spread F Excess soil shall be removetl or utile,etl as tlirectetl by Owner or the Owners r.p,.senhdi If pants to proper cmdos a upright positions,furnishing antl applying spays as necessary to top soil if ne ssary' Tree pits shall be Imeldlletl a notetl in attachetl specifications_ = Q a J plants in such a manner as to damage bad,,break branches,or destroy natoal shape_ dimensions specified,.far to the man hotly ofthe plant and notbud mduan.branch tip to tip_ the excess soil will not be used,itistheresponsibildy of flee Contractor to remove and cislnse cambalins.ds and tlisease,lifter control,mlrrmg,f,dilizimg.nld replanting Excavate all shmb antl g..nd-r betls as speclual antl backfill with planfing soil per LL AA,� 2 Provitle prolective covering tluring tlelivery_ Height is measured from the soil line to lee av,mge height of the canopy_Measurement dices of the disceoletl soil off site in an accepteble manner. D_ Planting areas and pants shall be protected al.II times against damage of any kind for the spedficafions_ }' W g C_ Deliver plant materials after Preparations for panting are complete,.ntl plant immar iately_ not aubmie any terminal growth,the container or root ball is also mol incl.dod_ G_ Tree pits shall be backfilled with.topsoil mixture as specified elsewhere in these duration of the maintenance antl establishment Wands.If any plants are injmed or d...gad, 4_ All existing p.vng base material to be removetl fin.planting areas antl,.pim ed with dean E = ^^ ,a^ p Roots or balls of all plants shall be atlequately protectetl at all times bo.sun and/or wind. specifications Palm tree qts will be backfilled with a mixture of up to 95%sand antl 5% they shall be treated or r,plac.di as tlirecled by the Owner or L-c-pe Amhitect al no top soil prior to planting_ Fin.l gratle within planting areas to be 2"below atljacent paved i�• V) s Balled.ntl bud.pped(B&B)plants that cannot be plantetl immachat.ly upon delivery shall be Unless otherwise sp.�,di,the tl,l.r.inimg measurement for trees shall be caliper,which organic material_ addhon.1 cost.The Contractor is responsible for ads of v odlal,an or theft tluring the s or top of curb_ Co U_ V 1 set on flee grountl and protected by havng soil,wet peat,or other acceptable material shall be measured 6"above the grountl for trees up to 4"in caliper,antl 12"above the grountl H_ Add fertilizer to tree pits as specifiad elsewhere in these sl.ri�.abons_ maintenance antl establishment Wood unless this responsibility is assumed in writing by 5. Soil in n rd-pad areas shall be tae of debris,inclutling Paving base or fill material,antl ■� wRe veang the roofs or balls keeping them moist for trees over 4"caliper. I_ Set ballad and budappetl stock on a layer of 50%native soil and 50%topsoil compact,di to a another party. calcareous materials such as shell,lime rock,concrete,plaster antl stucco_ Planting areas t V D. Do not remove container grown stock From conferrers until planting lime_ 6"tlepth_ Loosen burlap from top of sidi.s of the bell but no burlap shall be pulled fto. E Resin t foot antl vehicular bedfic from all lawn antl planfing areas after sacab.g antl planting containing excessive calcareous materials shall the.xcavaled to a minimum depth of(2')Iwo ` t) M `a E Label at least one tree,one palm.ntl one shmb of each v mAy with.sommly attachetl 2.08 GRASS MATERIALS underneath Remove nonorganic bintling material(f any)from tae ball_Imm.tliat,ly cut any op,mbo-Erect signs antl baram f requiretl and remove when lawn antl plantings are well feet a � do /& g waterproof tag bearing legible di-gn.tion of botanical and common name,f requested by A. Type_Sotl type shall be as spec fled on the lama died landscape plan antl associated plant damaged mots with dean shears.Using.plumb to assure that the tree is properly up.ghL, establishetl and accepted by Owner w, O LJJ LL Owner schetl le_ begin fill ng the hole antl tamp u,the HI mater al_When the hole is 2/3 filletl,water thoroughly F The Contractor shall be respons ble for maintaining atlequale protection of the site_Areas W A, a F Sotl:Time tlelivery sm that sort antl be placed within 24 hours after stripping_ Protect sort B. Dimensons:Th.sort shall be taken up-n cemm.ad.l size rectangles,preferably 12-inch x antl probe wit,a stick to be sure that no air pockets remain.R.-plumb,compete filling the cl.mag.tl by the Landscape Contractors men or equipment,or the men or equipment of his 1 Landsca Contractor is res ble for re tact dam. d sort_ E W i pe pons; p rg any ge against tlrying antl breaking of rdletl sdaips_ 24inc, hole,,erfamP,and water again no Ca them,,shall be repaired.l the ping all lant mat..,expense. m M Q C_ M..soa.,nt Sotl shall be m.asmad on the basis of square footage_Contractor shall be J_ Set container-grown stock.s above,laking care not to tlamage mots when removing the G. The Contractor is responsible for keeping all pant materials atlequately waleretl atter IRRIGATION W 1.05 JOB CONDITIONS responsible for complete coverage based on the square foof.ge shown on plans;therefore, container installation even if the irigafion system is not operational_Plants shall receive.thorough 1_ All landscepe...s(inclutling sort)shall be inigatedi with an mal.mromal automatic sprinkler ^ I' A_ Proceed wdh antl complete landscape work as mpldly as Porf f site become available_ Contractor shall factor in culling and shrinkage of materials_ K. During planting,do not cover the top of the mol ball with the so m dere All mp.,wires, watering immediately after planfing_ Moments, plants shall be w.mmd tluring the system peauchng 120%-mg.with 50%overlap or utilizing a drip-rngabon/low volume i a- (J^ v B_ Utilities Deform m,ldmber,of ov.rh.ad antl mal.mmuntl ufil ties antl perform work in D. The sod shall be suffic,ntly thick to provide a do.-stand of I ve grass_ Th.sort shall be bud.p mesh etc_,shall be removetl fto.the root ball_No synth tu,burlap is allowed on any andormnce and establishment Periodis per the man r.m.nts set forth "Water watering system_ No l.n l-pe installation shall ace until the irrigation system is ^^ U) ,which will avold possible tlamage.Ham excavate,as requiretl_Forty eight(48)hours Iva,fresh and unirruns,,althe t me of planing_Il shall be a soil mat of suffic art thickness,at plant material_Synthetic budap is unacceptable for mat,lis_Trees shall b,plantetl so that Requirements for Newly Planted Grass,Ground Covens,Shrubs antl Trees in Floma tonal,unless I- led b Owner or h s Iative,or Lantlsce 4 i�..l prior to digging,call the appropriate Utility Authority to have all utilities idru di ietl and marketl ar least 2"t,ck,ad h.o ng firmly to the roofs to withslend all necessary handl ng_It shall be free the top of the root ball is 2 above final die_Allow for s.l8n_An trees restin dee opera approve is gun y represen pe L gra g y n per or distributed by South Fact b Wafer Management District In those areas where r permanent Ar'chdect = G r ober to ld flicfs_ of weeds antl other grasses_Il shall be planted.g soon.s puss bl.atter be ng tlug,and shall higher must be a Lher reset or replacetl at the tl,cretian of the Owner or Lantlscepe Architect; -mgatimn system w II mol be pmvldetl,the Contractor-s respons ble far implementing the Q C_ Prot,cion of Existing Structures_All exisfing buildings,walks walls,paving,piping,antl other b,shaded and kept moist From the timet is tlug antl it-s planted.After approval,the area such work shall be al the Contractors expense. Watering Proemm d..W,.d-n the Landscape Plans_ M l items of construction and planting already cempletetl or establishetl shall be protected fto. from which the sod is to be harvested shall be closely mowed and raked as necessary to L Create a watering basin ammal each tree at least as widi.as the mot ball in diam,fer four art H_ The Landscape Contactor is responsible for keeping all plant materials atlequately m il-cl - tlamage.All tlamage resulting from negligence shall be aPairetl or,.pl.ead,inclutling but not remove excessive top growth.ntl debris_ by a dreul.r ridge of soil at least 6"high_ throughout the Maintenance antl EsLablislan-d Periods Fertilizer shall be.pPlietl.t a rade to � Z J , limited to marks on Pavans antl c eckswfhin existing walkways caused by the Contractor The M. Each planting basin shall be mulched to a minimum dept,of 3'(after settling)_Mulch shall not keep plant materials healthy_All fertilo.r shall be tlone untler the diremen of.hcemsetl KNOW WHAT'S BELOW Owner may,al his discretion have any tlamage repaired by others antl subsequently costs 2.07 REJECTION,SUBSTITUTION,AND RELOCATION be applietl unfil the tree has been thoroughly watered antl five tlays have dapsedi_ Mulch fumla.r oParaloa- ALWAYS CALL 811 b a kc ag,di to the Contractor A_ All plants not conforming to the a imenn.nfs herein speofi,tl shall be co-draod d.fo.b- AnnArl be placed so Leal it is not in direct contact with trunks_ I_ The Landscape Contractor shall control tlisease antl Pest infestations in the planfing area_ a BEFORE YOU DIG D. Protection of Existing Plant Material:The Contractor shall be responsible for all mundho-c! antl such plants shall be marked as rejectetl antl removed From the she whether in the grountl N_ All trees are to be staked a guyed Per these specifications_All stakes shall be painted. Upon approval,the Contactor shall implement the control m sng extreme cutting or tlamage to existing trees or shmbs caused by careless operation of equipment, mol,at Lee Contractors expense Such removal shall take place imarra l.ly antl new conspicuous co r or shall be flaggetl for visibility antl public safety;guy wires shall be caution in using ha-m-s materials antl faking all necessary steps to protect others on antl stockpiling of materials,etc_This shall include romped-by riming or parking i-d.the plants shall be brought in a replacements_The plant materials must meet all applicable flaggetl_ ar the job site_All disease antl Pest control shall be tlone untler the duachom of a hcensetl It's fast It's hee.lt's Ore law. tlrip-line of any tree,or spilling of oil,gasoline,or other doletonern,materials within the inspections requiretl by law_s O_ Palms shall be plantetl per above specifications_ d sease.otl pest control operator d Miin,of any tree_No materials shall be burned B. The Owner or L.ndscape Amhilecl.No aserves the right to require that plants be relocated J. Herbicidi.Wood Control:All landscepe areas shall be ftee of nut gess,lomado grass,antl W W W.callsunshine.com E Exce-bon When contlitions detrimental to plant growth are encountered,such as rubble fill, after installation if their initial installation does not conform to the plans or the intent of the 3.06 PLANTING SHRUBS,VINES,AND GROUND COVERS other noxious w,etls unfil Final mead.nce of.ed, ad--tlrainage contlitions,or obstructions,notify Landiscepe Amhitect before planting_ plans,or f the original location poses an unforeseen threat to other f.dliti,s,human life, A. The locations of all pants,bed outlines antl all other areas to be plantetl shall be clearly Last.A.tetl_April 2015 health,m safety,or to she utilities Such mlocetion shall be at the Contractors expense. marked wit,agricultural gypsum or landscape marking Paint then approved by the Owner or 1.'Round-up"shall be applied to all planting areas as needetl and tl,ler.inetl on-site by the PART II-PRODUCTS Landscape Architect before any holes are dug_ Owner for weetl control_Apply Per manufacturers specifications_ 2.01 TOPSOIL PART Ill-EXECUTION B. No planting shall be done until the area concerned has been sabsfamuffy preparetl in 2_'Ronst.e'prer.m.g.nt or OWNER-approv.tl equal,shall be applietl 2 weeks before A_ The Contractor is requiretl to obtain a soil sample and P,rforn a soil analysis test to 9.01 GENERAL cordance with these specifications_ planting.Apply per manufacturers spedfirefions_ data ino the-fling soil composition antl cancl.d.whether it complies with the composition A. Proceed wit,antl complete l.n l-pe wort,as rapidly as Portions of the site become C_ No mom plants shall b,d ist.but.d in the planting...on any work tlay than can be plantetl 3. Apply T-lade in.11 amus where tomad.grass has emeged_Apply per manufacturers criteria below_ v.ilable_ antl waleretl in that tlay_ specifications_ B_ Where topsoil does not meet the sp.cihod lards within the project site,it shall be famished B. No panting shall be done until all opeations in conjunction with the installation of the sprinkler D. Unless otherwise ind-t.d,.II plants shall be planted in pits,entered as called for on the 4. Apply"Basagra.'or'Marag,"in all areas where nutgass has.m mpetl_Apply per Throughout all parts of site where finish c mdos antl contour lines lifter from exisfing contour system have been cempletetl,final gratle,have been.steblishad,planting areas have been plant list,antl sal im 24'depth of topsoil as specified elsewhere in these sp.�cefions to such manufacturers specifications_ lines,bring to finish gratle centoms shown on"Gratling Plan' prol,dy graded antl preparetl_ depth that the soil line of the plants will match the surmuntline gratle after settling.Plants shall C_ Topsoil shall be friable,fertile soil with representative chamd.risbcs of local soils_It shall be C_ Ativ.rs.Cmndibons:When contlitions Potentially detrimental to plant growth are,rcomdoretl be planted in vertical position and o onted to give the best Possible appearance o K. Mowing of tun will commence ten(10)tlays after installation The height of cul will be 3'. fie.of heavy clay,mad,stone,extraneous lime,plant mots,refuse antl/a solidi waste,sticks, donne work,such ss rabble or.fuse fill,adverse drainage condifions,or abstractions,nobly relationship to atljacent structures or features.Remove.II inorganic containers or binding_All After the first cul,the Contractor shall adjust the frequency of.wing so that al each brash,construction tl,.olition clothes,and any other cut mnous.atormis.There shall be no Owner or L-c-p.Architect before planting_ damaged roots shall be cut away cleanly.Planting soil shall be placed and compactetl op,mbomn nnarmth.nl/3ofth,grass blas-sm.-atl p.rcuttrup o Date: 06-07-2017 woods or weetl seeds(i..,nal grass,Bermuda gess antl the like)_In no case shall D. Work Scheduling:Work is to be schadulod to establish a logical sequence of steps for carefully to fill all-ds and.void root injury_When the hole is 2/3 filletl,water thoroughly_The L Between the 15th antl 20th tlay of the Establishment P.nod,the Contractor shall re-sod.II Project No.: 05-017.003 them be.o,.Lh.n five percent(5%)by dry weight of clay lumps a stones larger than 1'.It completion of each type.ntl phase of l.ndsc.pe work,in such a way as to er-inorld with, hole shall then be filletl to finish gratle and a shallow saucer shall be formed arountl each bort_ spots or areas within the lawn where normal turf growth is not-dr nt Turf must be well shall test in the pH range of 60 to 72 antl shall centain no substenc.Lhal will imp,di,plant antl avold tlamage antl conflict with,other clisdphn.s on sit._ After settling,soil shall be added as needetl to bring the hole to gratle level establishetl.otl free of bare spots antl weedis to th,satisfaction of the OWNER or LarAscepe Designed By: TLM growth The Contractor shall have topsoil laboratory-lesletl at his expense and approved by E Coord-tion with Sodi/Lawn Plant trees,palms,and shmbs only after final gades a E Azaleas antl other,riceceous antl acitlamving plants shall be backfilled with.mime.of 20% Amhitect poor to final acceptance_ All plantetl areas other than lawn shall be woodad at Drawn By: TLM L.ndsc.p.Architect or Owner prior to malenal tlelivery_ established,and prior to sotlding or lawn establishment If such planfing must be tlone after leased.ntl 80%acid peat They shall be set so that the bases of the pl.nds are slightly higher intervals of not more than ten(10)tlays_ Checked By: JB lawn work,protect I.w Vsotl areas cmrtg planfing and promptly repair any resulting tlamage_ than they grew in the container or nursery after settling.At no lime shall lime in any forth be M_ Application of ferfilmo,to be done between the fortieth(40)antl fiftieth(50)tlay of the Topsoil shall conform to the folbwing specifications F Timing_ brought into contact with the plants or their roots_ Mulch with pine straw unless notetl establishment penorl Landscape Architect or Owner are to be notified.minimum of fody Revision Dates: 1. Planting work shall not be started until the final subgrado has been established,berms ol„rwise_ eight(48)hours in ativance_ COMPONENTS DRY W EIGHT MEASURE PARTICLE SIZE have been cenAm.ted antl fine harshedi gading competed F Add fertilizer to plants as outlined in section 2 02. N_ I.pmper maintenance or Poor contlition of any planting al the time of the termination of the Oganic Matter 2%-7% 2. Under no contlitions shall work be tlone f weather or soil contlitions.,e not satisfactory_ G_ Vines shall be plantetl in pts containing at least 2 cubic feet of preparetl topsoil They shall be scheduled Establishment Penotl may cause Postponement of the final acceptance of the Si8/Cl.y 2%-10% 10074 m. G_ Cleanup_ plantetl in the same manner as shmbs,antl shall be mulchetl_Vine stems shall be fastened to ontrad_Any malenal found to be dead,missing,or in poor contlition dining the.steblish.,nt Sandi 85%-98% 6075-300 a m 1. At.II times dunng the construction and installation,the she shall be.ainfanual ar walls,trellises,etc.as specified in the tlaawings. Wood shall be,.pl.cetl immediately_Maintenance shall be continuetl by the Contractor until Gravel 0%-5% 4 75 mm-1 inch dean,orderly antl safe con titian Sheets and pavements shall be kept clean Materials H_ Gro-d-or pants shall be lad out in their propose l planting locations without being the work is accepteble_ antl equipment for planting work shall be larded to the quantity requiretl for the particular ermeal from their conf.in.rs after the soil is property preparetl per these spomicabons_ O_ Inspection antl Final Acceptance: The analysis shall also show the following ranges_ phase of work mrently malraway on the job site. Planting.,thodelogy is the same as for other shmbs. Soluble salt 2-1 0m.mhes/cm 2. Protect landscape wort,and malenals fto.damage tlue to landscape installation antl I_ Any plants which,after settling,rest sigruficendly higher or even slightly lower than they grew 1. In.II cases the Landscape Architect will perform a initial antl final inspection at the Nitragen 25150 PPM aintmence operations,operations by other centraclom antl trades,antl trespassers. in the nursery or container are subject to msctting or replacement al the discretion of the beginning antl antl of the Establishment Penrod,respectively_Il is the responsibility of the Phosphorus 26-39 PPM Maintain protection tluring installation,Maintenance antl Establishment pounds. Treat, OWNER or Landscepe Amhitect Such work shall be al the Contractors expense_ Contractor to notfy the Owner or Landscape Architect of Lee beginning antl antl of this Potassium 50-250 PPM repair or replace damaged landscape work as tlirecled. J. If called for in the plans,land-p.edging shall be installetl as sp.�rAl P,ned antl to submit a written request for an inspection ten(10)tlays in ativance_ Calcium 500-2500 PPM K_ All planting betls and intlivldual plantings shall be mulched with a m of 3"(after 2. Following imspochen(s),L.ndsc.pe Architect will prepare a lisfing of oufsf.nlding items to Magnesium 50-500 PPM 9.02 SOIL PREPARATION settling)of mulch as sp.�,di in this do-urom Mulch shall be free of weetl soods antl other be addressed prior m final acceptance_ Final meoptenc.will be given o m the Iron 25-25 PPM A. Grading and soil Pap.mbon work shall be performed only tluring pedis when best results foreign matter ootslarn ing items are cempletetl,antl the work p.rmanod fu the satisfaction of the L P 3 Manganese 2 5-25 PPM can be obb inert_ft the moisture content of the sdl is high enough that work would tlamage Landscape Architect and OWNER_ _ Zinc 25-25 PPM soil structure,gracing antl tilling operations shall be suspended_ 3.07 ANNUAL AND SEASONAL COLOR BEDS 3. Any material that is 25%or.on.dying shall be co-draod tleatl antl must be repim etl Copper 1 3-5 PPM A_ Barts shall be.oumcled to a height 6"on top of the existing gado antl camposod of 50% at ao charge_A tree shall be considered tleatl when the main leader has dual or when Boron 65-1 5 PPM B_ Before mixing in soil amendments,dean topsoil of mots,plants,sorts,stones,clay lumps,and leased and 50%composL 25%of the crown is dead_A tree that has s.1mred significant leaf drop but shows signs o f 3 Sulphur 15-200 PPM other extraneous malenals hm.fol or toxic fo plant growth.Apply Herbidtle for weetl control B_ Soil shall be caver.d with%'-1'tleep layer of Pine Fines Mulch or comparable product. of Ife may be left for later rei-tro.ban Such trees shall be subject to removal and Chlorine less than 100 PPM needed .placement at any time up to antl inclutling the fins[m-inspection,as requestetl by the Sotlarm less than 10 C_ Mix specifietl soil.m.rdu encs and fertilizers with topsoil at rates spooned Delay mixing of 3.08 PRUNING Owner or Landscape Anmit.d_The Wananty Penod for such trees shall not begin until Nematodes none fertilizer f planting will not follow placing of planting soil within a few tlays. A. All laming shall be tlone in the presence of,and with the approval of,the Owner or after the second,.�mpo.bm,