Loading...
HomeMy WebLinkAbout1990-34 Storm Water ManagementPreparation of this Document was aided through financial assistance received from the State of Florida under the Local Government Land Development Regulation Assistance Program authorized by Chapter 89- 253, Laws of Florida, and administered by the Florida Department of Community Affairs. ORDIHANCE NO.34-90 AN ORDINANCE OF THE VILLAGE OF NORTH PALM BEACH, FLORIDA, FOR STORM WATER MANAGEMENT THROUGHOUT ALL AREAS of THE VILLAGE, INCLUDING NEW AND EXISTING AREAS THAT ARE REDEVELOPED/ PROVIDING FOR THE REPEAL OF ALL ORDINANCES OR PARTS OF ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING FOR AN EFFECTIVE DATE. BE IT ORDAINED BY THE VILLAGE COUNCIL OF NORTH PALM, FLORIDA: Dection 1. Storm water management, general, is hereby created as follows: 1. Tho storm water management system shall be designed in accordance with accepted engineering principles for design floods resulting from rainfall and tidal elevations experienced in the Intracoastal Waterway for storm frequencies as follows: (a) Minimum street grade shall exceed calculated flood levels resulting from a ten-year frequency storm tide plus rainfall runoff. (c) (b) The finished floor of all structures shall exceed the ono hundred -year tidal flooding and rainfall runoff level, but in no case shall be less than eight and five - tenths (8.5) feet above mean sea level. Storm drainage facilities, inoluding swales, inlets and conduits shall be designed on runoff predicted from a throe -year intensity rainfall ourve in general use for this area. (d) Roadside swales within street rights -of -way shall be constructed in accordance with approved typioal sections for the subdivision under consideration. Swale cross sections shall be designed to carry runoff up to the edge of pavement, or edge of improved property adjacent to the right-of-way. Surplus water from the swales shall be diverted into a closed storm drainage system or other approved means. Placement of permitted trees in a swale will be such that, as tree growth occurs, the design and function of the Swale are not compromised. Open channels and outfall ditches for the purpose of conveying storm runoff within any subdivision development will not be allowed. However, open channels conneoting to tidewater for the purpose of navigational access to existing or proposed waterways will be permitted provided they are protected by concrete bulkheads and have a minimum width of eighty (60) feet and a minimum center line depth of eight and zero tenths (6.0) feet. (f) In order to minimize the degradation of water quality in receiving bodies, all development will be provided with landscaped areas, grassed areas or other natural vegetated areas to receive runoff from buildings, pavement or other impervious areas to the degree that pollutants from these areas may be absorbed by the vegetation or percolated into the soil. No runoff from (0) 1 such impervious areas shall be discharged directly into any inlet or storm sewer without first being given the opportunity to pass through a natural vegetated area. Ali potential areas of soil erosion shall be protected to minimize siltation transport by flowing water. (g) The developer/owner of any site shall be responsible for the on -site management of storm water runoff in a manner such that post -development runoff rates, volumes and pollutant loads do not exceed predevelopment conditions as per Chapters 40E-4, 40E-40 and/or 40E-41, Florida Administrative Code. (h) The design of the storm water management system shall provide for protection of natural drainage features and promote the funotions of groundwater recharge areas. (i) where storm water retention systems are'required, any modification to, or construction of canals shall incorporate water and habitat quality enhancement features such as planted littoral zones or shallow shelves, bank slopes conducive to shoreline vegetation and immediate vegetative stabilization of any bare ground adjacent to the system, as appropriate. (j) To protect and preserve water quality, Best Management Practices (BMPs) for construction site runoff, as contained in Chapter 4.0 of the palm Beach Qounty Zee Areawide Waste Treatment Management Platt, shall be employed, 2. The requirements of Section 1.1, above, shall be in effect throughout all areas of the Village and shall pertain to all new and existing areas that are redeveloped. Section 2. All ordinances or parts of ordinances in conflict herewith are hereby repealed. Section 3.. This ordinance shall take effect immediately upon passage. PLACED ON FIRST READING THIS 13th DAY OF September PLACED ON SECOND, FINAL READING AND PASSED 'THIS 27tF September , 1990. MAYOR (village Seal) ^ATTEST: C�Ke-► w Village Clerk , 1990. DAY OF This Document was prepared by Craig A. Smith & Associates for the Village of North Palm Beach, August 1990. ordnpb.dge 9/21/90 2